Do you have any question about this error?
Message type: E = Error
Message class: CKMLMV - Message class for quantity structure tool
Message number: 023
Message text: Procurement alternative does not need to be corrected
You have performed multi-level price determination with the indicator
<DS:DE.CKML_CUTBOM>Reduced actual BOM</> set, for the following
procurement alternatives:
Plant : &v2&
Material : &v3&
Procurement alternative : &v4&
Internal number : &v1&
An error occured (a negative price or a change exceeding the percentage
threshold value), but it was still possible to determine the material
price correctly. Therefore, the input quantities do not need to be
reduced for this procurement alternative.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CKMLMV023
- Procurement alternative does not need to be corrected ?The SAP error message CKMLMV023, which states "Procurement alternative does not need to be corrected," typically occurs in the context of Material Ledger and inventory management processes. This message indicates that the system has determined that there is no need to make corrections to the procurement alternative for a specific material.
Cause:
- No Changes Required: The procurement alternative for the material is already set correctly, and there are no discrepancies that require correction.
- Material Ledger Settings: The settings in the Material Ledger may not require any adjustments for the procurement alternative.
- Data Consistency: The data related to the procurement alternative is consistent with the current configuration and does not need any updates.
Solution:
- Review Material Master Data: Check the material master data for the specific material to ensure that the procurement alternative is set up correctly.
- Check Configuration: Verify the configuration settings in the Material Ledger and ensure that they align with your business processes.
- No Action Required: If the message indicates that no correction is needed, you may not need to take any action. It is a confirmation that the current settings are appropriate.
- Consult Documentation: Refer to SAP documentation or help resources for further insights into the specific context of the error message.
Related Information:
MM03
(Display Material) or CKM3N
(Material Ledger Document) to review the material and its procurement alternatives.In summary, the CKMLMV023 error message indicates that no correction is needed for the procurement alternative, and it is essential to verify the material master data and configuration settings to ensure everything is in order.
Get instant SAP help. Start your 7-day free trial now.
CKMLMV022
A target BOM was created for the procurement process
What causes this issue? You have performed multi-level material settlement with the indicator <DS:DE.CKML_CUTBOM>Reduced actual BOM</> se...
CKMLMV021
Multilevel price determination with a reduced actual BOM
What causes this issue? You have performed multi-level price determination with the indicator <DS:DE.CKML_CUTBOM>Reduced actual BOM</> se...
CKMLMV024
Material sucessfully costed with reduced BOM
What causes this issue? You have performed multi-level price determination with the indicator <DS:DE.CKML_CUTBOM>Reduced actual BOM</>.Sy...
CKMLMV025
More material prices need to be determined with multi-level determination
What causes this issue? You indicated that all material prices should be determined again upon multi-level material price determination.System Respon...
Click on this link to search all SAP messages.