How To Fix CKMLMV020 - Step &1: Packet &2 is first costed with the actual BOM


CKMLMV020 - Overview

  • Message type: E = Error

  • Message class: CKMLMV - Message class for quantity structure tool

  • Message number: 020

  • Message text: Step &1: Packet &2 is first costed with the actual BOM

  • Show details Hide details
  • INCLUDE CKMLMV021 OBJECT DOKU ID NA LANGUAGE EN

    Error message extract from SAP system. Copyright SAP SE.


CKMLMV020 - Details

  • The SAP error message CKMLMV020 typically occurs during the costing process in the Material Ledger when there is an issue with the costing of a material based on its Bill of Materials (BOM). This error indicates that the system is trying to cost a material using the actual BOM, but it has encountered a problem.
    
    Cause: BOM
    Configuration Issues: The BOM for the material may not be correctly configured or may not exist for the specific period being processed. Material Master Data: The material master data may not be set up correctly, particularly in relation to the costing view. Costing Variant: The costing variant used may not be appropriate for the material or may not be configured correctly. Versioning Issues: There may be issues with the version of the BOM being used, especially if there are multiple versions or if the BOM has been changed recently. Data Inconsistencies: There may be inconsistencies in the data related

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


CKMLMV020 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author