How To Fix CKMLMV020 - Step &1: Packet &2 is first costed with the actual BOM


CKMLMV020 - Overview

  • Message type: E = Error

  • Message class: CKMLMV - Message class for quantity structure tool

  • Message number: 020

  • Message text: Step &1: Packet &2 is first costed with the actual BOM

  • Show details Hide details
  • INCLUDE CKMLMV021 OBJECT DOKU ID NA LANGUAGE EN

    Error message extract from SAP system. Copyright SAP SE.


CKMLMV020 - Details

  • The SAP error message CKMLMV020 typically occurs during the costing process in the Material Ledger when there is an issue with the costing of a material based on its Bill of Materials (BOM). This error indicates that the system is trying to cost a material using the actual BOM, but it has encountered a problem.
    
    Cause: BOM
    Configuration Issues: The BOM for the material may not be correctly configured or may not exist for the specific period being processed. Material Master Data: The material master data may not be set up correctly, particularly in relation to the costing view. Costing Variant: The costing variant used may not be appropriate for the material or may not be configured correctly. Versioning Issues: There may be issues with the version of the BOM being used, especially if there are multiple versions or if the BOM has been changed recently. Data Inconsistencies: There may be inconsistencies in the data related

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


CKMLMV020 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker