Do you have any question about this error?
Message type: E = Error
Message class: CKMLMV - Message class for quantity structure tool
Message number: 020
Message text: Step &1: Packet &2 is first costed with the actual BOM
Error message extract from SAP system. Copyright SAP SE.
CKMLMV020
- Step &1: Packet &2 is first costed with the actual BOM ?The SAP error message CKMLMV020 typically occurs during the costing process in the Material Ledger when there is an issue with the costing of a material based on its Bill of Materials (BOM). This error indicates that the system is trying to cost a material using the actual BOM, but it has encountered a problem.
Cause:
- BOM Configuration Issues: The BOM for the material may not be correctly configured or may not exist for the specific period being processed.
- Material Master Data: The material master data may not be set up correctly, particularly in relation to the costing view.
- Costing Variant: The costing variant used may not be appropriate for the material or may not be configured correctly.
- Versioning Issues: There may be issues with the version of the BOM being used, especially if there are multiple versions or if the BOM has been changed recently.
- Data Inconsistencies: There may be inconsistencies in the data related to the material, such as missing components in the BOM or incorrect quantities.
Solution:
- Check BOM Configuration: Verify that the BOM for the material is correctly configured and exists for the relevant period. Ensure that all components are included and have the correct quantities.
- Review Material Master Data: Check the material master data to ensure that the costing view is properly set up and that all necessary fields are filled out correctly.
- Examine Costing Variant: Review the costing variant being used to ensure it is appropriate for the material and that it is configured correctly in the system.
- Validate BOM Versions: If there are multiple versions of the BOM, ensure that the correct version is being used for costing. You may need to adjust the version settings.
- Run Consistency Checks: Use transaction codes like CKMLCP (Material Ledger Closing) or CKMLMV (Material Ledger: Costing) to run consistency checks and identify any discrepancies in the data.
- Consult SAP Notes: Check for any relevant SAP Notes that may address this specific error message or provide additional guidance on resolving it.
Related Information:
If the problem persists after following these steps, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP costing and Material Ledger processes.
Get instant SAP help. Start your 7-day free trial now.
CKMLMV019
No target BOM determinable for procurement process
What causes this issue? You have performed multi-level material settlement with the indicator <DS:DE.CKML_CUTBOM>Reduced actual BOM</> se...
CKMLMV018
Step &1: Packet &2 costed again with a reduced BOM
INCLUDE CKMLMV021 OBJECT DOKU ID NA LANGUAGE ENError message extract from SAP system. Copyright SAP SE. ...
CKMLMV021
Multilevel price determination with a reduced actual BOM
What causes this issue? You have performed multi-level price determination with the indicator <DS:DE.CKML_CUTBOM>Reduced actual BOM</> se...
CKMLMV022
A target BOM was created for the procurement process
What causes this issue? You have performed multi-level material settlement with the indicator <DS:DE.CKML_CUTBOM>Reduced actual BOM</> se...
Click on this link to search all SAP messages.