How To Fix CKMLMV020 - Step &1: Packet &2 is first costed with the actual BOM


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CKMLMV - Message class for quantity structure tool

  • Message number: 020

  • Message text: Step &1: Packet &2 is first costed with the actual BOM

  • Show details Hide details
  • INCLUDE CKMLMV021 OBJECT DOKU ID NA LANGUAGE EN

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CKMLMV020 - Step &1: Packet &2 is first costed with the actual BOM ?

    The SAP error message CKMLMV020 typically occurs during the costing process in the Material Ledger when there is an issue with the costing of a material based on its Bill of Materials (BOM). This error indicates that the system is trying to cost a material using the actual BOM, but it has encountered a problem.

    Cause:

    1. BOM Configuration Issues: The BOM for the material may not be correctly configured or may not exist for the specific period being processed.
    2. Material Master Data: The material master data may not be set up correctly, particularly in relation to the costing view.
    3. Costing Variant: The costing variant used may not be appropriate for the material or may not be configured correctly.
    4. Versioning Issues: There may be issues with the version of the BOM being used, especially if there are multiple versions or if the BOM has been changed recently.
    5. Data Inconsistencies: There may be inconsistencies in the data related to the material, such as missing components in the BOM or incorrect quantities.

    Solution:

    1. Check BOM Configuration: Verify that the BOM for the material is correctly configured and exists for the relevant period. Ensure that all components are included and have the correct quantities.
    2. Review Material Master Data: Check the material master data to ensure that the costing view is properly set up and that all necessary fields are filled out correctly.
    3. Examine Costing Variant: Review the costing variant being used to ensure it is appropriate for the material and that it is configured correctly in the system.
    4. Validate BOM Versions: If there are multiple versions of the BOM, ensure that the correct version is being used for costing. You may need to adjust the version settings.
    5. Run Consistency Checks: Use transaction codes like CKMLCP (Material Ledger Closing) or CKMLMV (Material Ledger: Costing) to run consistency checks and identify any discrepancies in the data.
    6. Consult SAP Notes: Check for any relevant SAP Notes that may address this specific error message or provide additional guidance on resolving it.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CK11N (Create Cost Estimate), CK40N (Change Cost Estimate), and CKMLCP (Material Ledger Closing).
    • SAP Documentation: Refer to SAP Help documentation for detailed information on Material Ledger and costing processes.
    • User Forums and Communities: Engage with SAP user communities or forums for insights from other users who may have encountered similar issues.

    If the problem persists after following these steps, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP costing and Material Ledger processes.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author