Message type: E = Error
Message class: CKBK - Messages of the Valuation Functions
Message number: 040
Message text: Valuation date &1 falls outside the costing period
The valuation date &v1& does not fall within the validity period from
&v2& to &v3& for cost estimate &v4&.
The valuation date remains unchanged.
Either choose a valid valuation date or change the validity period of
the cost estimate.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CKBK040
- Valuation date &1 falls outside the costing period ?The SAP error message CKBK040 indicates that the valuation date specified in a transaction falls outside the defined costing period. This typically occurs when you are trying to perform a costing operation (like a material valuation or a cost estimate) for a date that is not within the active costing period defined in the system.
Cause: Costing Period Not Open: The costing period for the specified valuation date is closed. This means that the system does not allow any cost calculations or adjustments for that period. Incorrect Valuation Date: The valuation date provided in the transaction is incorrect or not aligned with the open periods in the system.
Configuration Issues: There may be configuration settings in the controlling area or company code that restrict the costing periods.
Solution: Check Costing Periods: Go to the transaction code OKP1 (for controlling area) or OKP2 (for company code) to check the status of the costing periods. Ensure that the costing period
Get instant SAP help. Sign up for our Free Essentials Plan.
CKBK039
Automatic account assignment determines invalid cost element &
What causes this issue? Automatic account assignment determines consumption account &v1&. This account is invalid in company code &v4&...
CKBK038
Transfer cost component split/primary cost component split
What causes this issue? When you valuate costing item &v3& the referenced cost component split (cost component structure &v1&) is tra...
CKBK041
Valuation date &1 falls outside the costing period
What causes this issue? Valuation date &v1& for cost estimate &v2& falls outside of the new validity period from &v3& to &...
CKBK042
Cost estimate &1 has been deleted
What causes this issue? Cost estimate &v1& was deleted in this transaction.System Response The cost estimate is no longer displayed and can ...
Click on this link to search all SAP messages.