Do you have any question about this error?
Message type: E = Error
Message class: CKBK - Messages of the Valuation Functions
Message number: 041
Message text: Valuation date &1 falls outside the costing period
Valuation date &v1& for cost estimate &v2& falls outside of the new
validity period from &v3& to &v4&.
The validity period remains unchanged.
Either first change the valuation date, or else extend the validity
period.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CKBK041
- Valuation date &1 falls outside the costing period ?The SAP error message CKBK041 indicates that the valuation date specified in a transaction falls outside the defined costing period. This typically occurs when you are trying to perform a costing operation (like a material valuation or a cost estimate) for a date that is not within the range of the active costing periods in the system.
Cause:
- Costing Period Configuration: The costing period for the material or product has not been set up correctly, or the period is closed.
- Valuation Date: The valuation date you are trying to use is either in the past or future relative to the defined costing periods.
- Period Locking: The period may be locked for posting, which prevents any costing activities from being performed.
Solution:
Check Costing Periods:
- Go to the transaction code OKP1 (for controlling area) or OKP2 (for cost center) to check the defined costing periods.
- Ensure that the costing period you are trying to use is open and active.
Adjust Valuation Date:
- If possible, adjust the valuation date in your transaction to fall within the open costing periods.
Open the Costing Period:
- If you need to perform costing for a closed period, you may need to open that period temporarily. This can be done in the same transaction (OKP1 or OKP2) by changing the status of the period.
Consult with Finance Team:
- If you are unsure about changing the costing periods or if it impacts financial reporting, consult with your finance or controlling team to ensure compliance with accounting practices.
Review Configuration:
- Ensure that the configuration for the costing variant and valuation methods is set up correctly in the system.
Related Information:
By following these steps, you should be able to resolve the CKBK041 error and successfully perform your costing operations.
Get instant SAP help. Start your 7-day free trial now.
CKBK040
Valuation date &1 falls outside the costing period
What causes this issue? The valuation date &v1& does not fall within the validity period from &v2& to &v3& for cost estimate ...
CKBK039
Automatic account assignment determines invalid cost element &
What causes this issue? Automatic account assignment determines consumption account &v1&. This account is invalid in company code &v4&...
CKBK042
Cost estimate &1 has been deleted
What causes this issue? Cost estimate &v1& was deleted in this transaction.System Response The cost estimate is no longer displayed and can ...
CKBK043
Costing item &1 is incorrect
What causes this issue? Costing item &v1& references to costing &v2& with the status <LS>costed with errors</>.System Res...
Click on this link to search all SAP messages.