Message type: E = Error
Message class: CKBA - Message Pool for Development Class CKBA
Message number: 051
Message text: Alternative & cannot be deleted (database problems)
The procurement alternative could not be deleted.
Problems with the database upon trying to delete the procurement
alternative.
Inform your system administrator
Error message extract from SAP system. Copyright SAP SE.
CKBA051
- Alternative & cannot be deleted (database problems) ?The SAP error message CKBA051 indicates that an alternative (such as a BOM alternative or routing alternative) cannot be deleted due to database problems. This error typically arises when there are inconsistencies or issues in the database that prevent the deletion of the specified alternative. Causes: Database Locking Issues: The alternative may be locked by another transaction or user, preventing deletion. Referential Integrity Violations: There may be dependencies or references to the alternative in other database tables, which prevents its deletion. Data Inconsistencies: Corrupted or inconsistent data in the database can lead to this error. Authorization Issues: The user may not have the necessary permissions to delete the alternative. Technical Issues: Problems with the database itself, such as connectivity issues or database corruption. Solutions: Check for Locks: Use transaction codes like SM12 to check for any locks on the alternative. If there are locks, you may need to wait for them to be released or contact the user
Get instant SAP help. Sign up for our Free Essentials Plan.
CKBA050
Lot size & is outside lot-size range of routing
What causes this issue? The stated lot size &V1& exceeds the lot size range of &V2& to &V3& in the routing.System Response A...
CKBA049
No BOM or routing for production version &
What causes this issue? There is no BOM or routing for this production version.System Response The system is attempting to assign a BOM and routing ...
CKBA052
BOM & and routing & are not suitable for production version &
What causes this issue? The data in the BOM, routing and production version in the procurement alternative is not compatible.System Response In join...
CKBA055
Material & costed without quantity structure
What causes this issue? You are attempting to create a procurement alternative for a material assigned to a <DS:GLOS.material_type>material typ...
Click on this link to search all SAP messages.