Do you have any question about this error?
Message type: E = Error
Message class: CKBA - Message Pool for Development Class CKBA
Message number: 050
Message text: Lot size & is outside lot-size range of routing
The stated lot size &V1& exceeds the lot size range of &V2& to &V3& in
the routing.
A procurement alternative can be created.
Either enter a lot size within the lot size range between &V2& and &V3&
or enter another routing.
Error message extract from SAP system. Copyright SAP SE.
CKBA050
- Lot size & is outside lot-size range of routing ?The SAP error message CKBA050 indicates that the lot size specified for a production order or a planned order is outside the allowable lot size range defined in the routing for that material. This can occur during various processes, such as when creating a production order, running MRP (Material Requirements Planning), or during the confirmation of production activities.
Cause:
- Lot Size Configuration: The routing for the material has defined a specific lot size range (minimum and maximum lot sizes) that the production order must adhere to. If the lot size you are trying to use falls outside this range, the error will occur.
- Order Quantity: The quantity specified in the production order or planned order does not meet the minimum or exceeds the maximum lot size defined in the routing.
- Routing Settings: The routing may have been set up incorrectly, or the lot size range may not have been updated to reflect current production needs.
Solution:
- Check Lot Size in Production Order: Review the lot size specified in the production order or planned order. Ensure that it falls within the defined range in the routing.
- Review Routing Configuration:
- Go to the routing for the material in question (Transaction code: CA03).
- Check the lot size range defined in the routing. You can find this in the "General Data" or "Lot Size" section.
- Adjust Lot Size: If the lot size in the production order is incorrect, adjust it to fall within the defined range.
- Modify Routing: If the current lot size range in the routing is not suitable for your production needs, consider updating the routing to allow for a wider range of lot sizes. This can be done by:
- Editing the routing (Transaction code: CA02).
- Adjusting the minimum and maximum lot sizes as necessary.
- Consult with Production Planning: If you are unsure about the appropriate lot sizes, consult with your production planning team to determine the correct settings.
Related Information:
By following these steps, you should be able to resolve the CKBA050 error and ensure that your production orders comply with the defined routing parameters.
Get instant SAP help. Start your 7-day free trial now.
CKBA049
No BOM or routing for production version &
What causes this issue? There is no BOM or routing for this production version.System Response The system is attempting to assign a BOM and routing ...
CKBA048
Change not required
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CKBA051
Alternative & cannot be deleted (database problems)
What causes this issue? The procurement alternative could not be deleted.System Response Problems with the database upon trying to delete the procur...
CKBA052
BOM & and routing & are not suitable for production version &
What causes this issue? The data in the BOM, routing and production version in the procurement alternative is not compatible.System Response In join...
Click on this link to search all SAP messages.