Do you have any question about this error?
Message type: E = Error
Message class: CI - Plant maintenance task list messages
Message number: 082
Message text: The unit for the work has been copied from the sub-operation
The work of the summarization operation &V1& does not have a unit.
The system uses the unit of work from the first sub-operation for which
you have specified a unit of work.
You can avoid this warning being displayed by specifying a unit of work
for the summarization operation in the
<DS:GLOS.maintenance_task_list>maintenance task list</>.
Error message extract from SAP system. Copyright SAP SE.
CI082
- The unit for the work has been copied from the sub-operation ?The SAP error message CI082 indicates that there is an issue with the unit of measure (UoM) for a work center or operation in a production order or routing. Specifically, it suggests that the unit of measure for the work has been copied from a sub-operation, which may not be appropriate or consistent with the main operation.
Cause:
- Inconsistent Units of Measure: The unit of measure for the main operation may differ from that of the sub-operation, leading to confusion in calculations or reporting.
- Configuration Issues: There may be a misconfiguration in the routing or work center settings, where the units of measure are not aligned.
- Data Entry Errors: Manual entry errors during the creation or modification of the routing or production order can lead to this issue.
Solution:
Check Routing and Work Center Settings:
- Navigate to the routing or work center in question and verify the units of measure for both the main operation and sub-operation.
- Ensure that the units of measure are consistent and appropriate for the operations being performed.
Adjust the Unit of Measure:
- If the unit of measure for the main operation is incorrect, change it to match the sub-operation or vice versa, depending on the business requirements.
- You can do this in the routing transaction (e.g., CA01 for creating or CA02 for changing a routing).
Review Production Order:
- If the error occurs in a production order, check the order details to ensure that the units of measure are correctly set.
- You may need to re-create the production order if the issue persists after adjustments.
Consult Documentation:
- Review SAP documentation or help files related to routing and work center configuration to ensure compliance with best practices.
Testing:
- After making changes, test the routing or production order to ensure that the error no longer occurs.
Related Information:
If the problem persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning and control.
Get instant SAP help. Start your 7-day free trial now.
CI081
You do not have the necessary authorizations for maintaining task lists
What causes this issue? You have tried to call up the task list with the change function.System Response The system will not allow this, as you do n...
CI080
Invalid selection: Choose function according to task list type
What causes this issue? You tried to edit an alternative version of a task list using a transaction that is not valid for the desired reference objec...
CI089
Task list still being used in maintenance item & !
What causes this issue? You want to undo the release of the task list for order processing using the task list status. However, the task list is stil...
CI090
Task list used in maintenance item &, no changes possible
What causes this issue? You want to cancel the release of the task list for order processing using the task list status. However, the task list is st...
Click on this link to search all SAP messages.