Do you have any question about this error?
Message type: E = Error
Message class: CB - PP-PI-PMA: Dialog Messages for Process Management
Message number: 541
Message text: Parameter & not defined for resource &
The process message selected was used to confirm a time event (partial
finish) for a variable activity for the phase &V3&. However, the
activity with parameter ID &V1& specified in the message has not been
defined in the standard value key of the corresponding resource. For
this reason, the destination cannot process the message, that is, the
confirmation was not posted.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
If the message has not been sent to another destination, correct the
message and send it from within the message monitor.
Otherwise, post the confirmation manually if necessary.
<DS:TRAN.CORZ>Enter confirmation</>
Error message extract from SAP system. Copyright SAP SE.
CB541
- Parameter & not defined for resource & ?The SAP error message CB541, which states "Parameter & not defined for resource &," typically occurs in the context of SAP's Capacity Planning and Production Planning modules. This error indicates that a specific parameter required for a resource (such as a work center or production line) has not been defined in the system.
Cause:
- Missing Parameter Definition: The parameter that is being referenced in the error message has not been set up for the specified resource. This could be due to incomplete configuration or missing entries in the resource master data.
- Incorrect Resource Assignment: The resource may not be correctly assigned to the relevant planning or production process, leading to the system not recognizing the required parameters.
- Data Migration Issues: If data has been migrated from another system, some parameters may not have been transferred correctly, leading to missing definitions.
Solution:
Check Resource Master Data:
- Navigate to the resource (work center or production line) in the SAP system.
- Verify that all necessary parameters are defined. This can typically be done in transaction codes like
CR01
(Create Work Center) orCR02
(Change Work Center).- Ensure that the parameters required for the specific planning scenario are filled in.
Define Missing Parameters:
- If the parameter is indeed missing, you will need to define it. This can involve entering values for parameters such as capacity, available working time, or other relevant settings.
- Consult the documentation or configuration guides for the specific parameters that need to be set for the resource type you are working with.
Review Configuration Settings:
- Check the configuration settings in the relevant customizing transactions (e.g., SPRO) to ensure that the parameters are correctly set up for the resource type.
- Ensure that the resource is assigned to the correct planning group or production process.
Consult SAP Notes:
- Search for relevant SAP Notes that may address this specific error. Sometimes, there are known issues or patches that can resolve the problem.
Testing:
- After making the necessary changes, perform a test to ensure that the error no longer occurs. This may involve running the planning or production process again to see if the issue is resolved.
Related Information:
CR01
, CR02
, CR03
(for work centers), and C223
(for defining parameters).By following these steps, you should be able to identify the cause of the CB541 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
CB540
Maintenance language user status: &
What causes this issue? The user status specified in the process message is set in language <ZH>&V1&</> in the process order. The...
CB539
User status & is not permitted (order & operation & language &)
What causes this issue? The selected process message specifies that the user status &V1& is to be set for operation &V3& of the order...
CB542
Quantity to be posted for material & = 0; no goods movement posted
What causes this issue? The process message you have selected serves to post a goods movement. However, value <LS>0</> has been entered a...
CB546
No by-product or co-product item for material &1 order &2 found
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.