Message type: E = Error
Message class: C7 - Scheduling
Message number: 110
Message text: Outline finish date is after requirements date &
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
C7110
- Outline finish date is after requirements date & ?The SAP error message C7110, which states "Outline finish date is after requirements date," typically occurs in the context of project management or production planning when there is a mismatch between the scheduling of activities or resources. This error indicates that the finish date of an outline (such as a project task or production order) is set to a date that is later than the required date for the associated requirements.
Cause: Incorrect Scheduling: The finish date of the outline is set incorrectly, possibly due to manual entry errors or miscalculations. Dependencies: There may be dependencies or constraints that have not been properly accounted for, leading to a situation where the finish date cannot logically precede the requirements date. Data Entry Errors: Mistakes during data entry, such as entering the wrong dates or not updating the schedule after changes in requirements.
Configuration Issues: There may be issues with the configuration of the project or production
Get instant SAP help. Sign up for our Free Essentials Plan.
C7109
Basic finish date is after requirements date &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C7108
Lot size is not within selected lot size range
What causes this issue? You have entered a lot size for scheduling that is not within the lot size range of the routing that you want to schedule.Sys...
C7111
Check if rate-based scheduling is appropriate -> see long text
What causes this issue? You are attempting to set the <ZH>scheduling</> and/or <ZH>capacity planning</> indicators for severa...
C7112
Dependency is too complicated; routing & , sequence & , operation &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.