How To Fix C7109 - Basic finish date is after requirements date &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: C7 - Scheduling

  • Message number: 109

  • Message text: Basic finish date is after requirements date &

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message C7109 - Basic finish date is after requirements date & ?

    The SAP error message C7109, which states "Basic finish date is after requirements date," typically occurs in the context of production planning and scheduling. This error indicates that the planned finish date of a production order or operation is later than the required date for the materials or products. This can lead to issues in meeting delivery deadlines and can disrupt the production schedule.

    Causes:

    1. Incorrect Scheduling Parameters: The basic finish date may have been set incorrectly due to wrong scheduling parameters or settings in the production order.
    2. Lead Time Issues: The lead times for production or procurement may not have been correctly defined, causing the finish date to extend beyond the required date.
    3. Capacity Constraints: If there are capacity constraints in the production environment, it may push the finish date beyond the required date.
    4. Changes in Demand: Changes in customer demand or order requirements may not have been reflected in the production schedule, leading to discrepancies.
    5. Resource Availability: Unavailability of resources (machines, labor, etc.) can delay the production process, resulting in a later finish date.

    Solutions:

    1. Review Production Order Dates: Check the production order and ensure that the basic finish date is set correctly. Adjust the dates if necessary.
    2. Adjust Scheduling Parameters: Review and adjust the scheduling parameters in the production order to ensure that they align with the required dates.
    3. Check Lead Times: Verify the lead times for production and procurement. Adjust them if they are not realistic or if they have changed.
    4. Capacity Planning: Analyze the capacity of the production resources and make adjustments to ensure that they can meet the required finish dates.
    5. Reschedule Production: If there are changes in demand or resource availability, consider rescheduling the production order to align with the new requirements.
    6. Consult with Planning Team: Collaborate with the planning team to ensure that all changes in demand and production schedules are accurately reflected in the system.

    Related Information:

    • Transaction Codes: You may use transaction codes like CO02 (Change Production Order) or CO03 (Display Production Order) to review and modify production orders.
    • Production Planning (PP) Module: This error is related to the SAP PP module, which deals with production planning and control.
    • Documentation: Refer to SAP documentation or help files for more detailed information on scheduling and production order management.
    • User Exits and BAdIs: If the issue persists, consider checking for any user exits or BAdIs that may be affecting the scheduling logic.

    By addressing the underlying causes and implementing the suggested solutions, you should be able to resolve the C7109 error and ensure that your production schedules align with the required dates.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author