Message type: E = Error
Message class: C7 - Scheduling
Message number: 108
Message text: Lot size is not within selected lot size range
You have entered a lot size for scheduling that is not within the lot
size range of the routing that you want to schedule.
The system schedules using the lot size that you have specified, even
though it is not within the lot size range.
If you want to schedule the routing with a lot size that is within the
lot size range specified for the routing, you have the following
options:
Enter a lot size that is within the lot size range of the routing, or
change the lot size range of the routing so that is includes the lot
size specified, or
schedule a routing with a lot size range that includes the lot size
specified.
Error message extract from SAP system. Copyright SAP SE.
C7108
- Lot size is not within selected lot size range ?The SAP error message C7108, "Lot size is not within selected lot size range," typically occurs in the context of production planning or material requirements planning (MRP) when the lot size specified for a production order or purchase requisition does not fall within the defined lot size range for the material in question.
Cause:
- Lot Size Configuration: The material master record for the item may have a defined lot size range that the specified lot size does not meet. This can happen if the lot size is set too low or too high compared to the minimum and maximum lot sizes defined in the material master.
- MRP Settings: The MRP settings for the material may not align with the lot size being requested. For example, if the MRP type is set to a specific lot size strategy that does not accommodate the requested size.
- Production Order or Purchase Requisition: The user may have manually entered a lot size that is outside the acceptable range when creating a production order or purchase requisition.
Solution:
Check Material Master Data:
- Go to the material master record (transaction code MM03) and check the lot size settings under the relevant views (e.g., MRP view).
- Ensure that the lot size you are trying to use falls within the defined minimum and maximum lot sizes.
Adjust Lot Size:
- If the lot size is incorrect, adjust it to a value that is within the defined range. This can be done when creating or modifying the production order or purchase requisition.
Review MRP Settings:
- Check the MRP type and lot size strategy assigned to the material. Ensure that they are appropriate for the production or procurement process you are using.
Consult with Configuration Team:
- If necessary, consult with your SAP configuration team to review the lot size settings and make adjustments to the material master or MRP settings as needed.
User Training:
- Ensure that users are trained on how to select appropriate lot sizes when creating production orders or purchase requisitions to avoid this error in the future.
Related Information:
Transaction Codes:
Lot Size Types:
Documentation:
By following these steps, you should be able to resolve the C7108 error and ensure that your lot sizes are correctly configured and used within SAP.
Get instant SAP help. Start your 7-day free trial now.
C7107
Enter a valid scheduling type
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C7106
Finish date is in the past
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C7109
Basic finish date is after requirements date &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C7110
Outline finish date is after requirements date &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...