Message type: E = Error
Message class: C7 - Scheduling
Message number: 029
Message text: No release period key defined for scheduling
You have not defined a scheduling margin key for the planned order.
INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJECT DOKU ID TX
INCLUDE 'NA_ALLG_VORGEHEN' OBJECT DOKU ID TX
Maintain the scheduling margin key.
<DS:TRAN.OPCW>Proceed</>
ENDIF
Error message extract from SAP system. Copyright SAP SE.
C7029
- No release period key defined for scheduling ?The SAP error message C7029, "No release period key defined for scheduling," typically occurs in the context of production planning and scheduling within the SAP system. This error indicates that the system cannot find a defined release period key for the scheduling of a particular production order or planning scenario.
Cause:
- Missing Release Period Key: The primary cause of this error is that the release period key has not been defined in the system for the relevant material or production order.
- Configuration Issues: There may be configuration issues in the production planning settings, particularly in the material master or the production scheduling profile.
- Master Data Issues: The material master record may not have the necessary data filled in, or the relevant views may not be maintained.
- Incorrect Planning Parameters: The planning parameters set in the system may not align with the requirements for the specific production order.
Solution:
Define Release Period Key:
- Go to the transaction code SPRO (SAP Reference IMG).
- Navigate to Production ? Production Planning ? Basic Settings ? Define Release Period Key.
- Ensure that a release period key is defined and that it meets the requirements of your scheduling needs.
Check Material Master:
- Use transaction code MM03 to display the material master.
- Check the relevant views (e.g., MRP view) to ensure that the release period key is correctly assigned.
Review Production Scheduling Profile:
- Check the production scheduling profile assigned to the material or production order.
- Ensure that the profile is correctly configured to include the necessary release period key.
Validate Planning Parameters:
- Review the planning parameters in the configuration settings to ensure they are set correctly for the production environment.
Consult Documentation: If the issue persists, refer to SAP documentation or consult with your SAP support team for further assistance.
Related Information:
By following these steps, you should be able to resolve the C7029 error and ensure that the release period key is properly defined for your scheduling needs in SAP.
Get instant SAP help. Start your 7-day free trial now.
C7028
No work center or calender in operation/activity
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C7027
Quantity unit of the operation/activity is invalid
What causes this issue? The quantity unit that you have maintained in the operation does not exist.System Response INCLUDE 'NA_ALLG_NOVERARBEIT...
C7030
Start date is in the past: today scheduling
What causes this issue? The start date determined in scheduling is in the past. In customizing, you have defined the number of days that the start da...
C7031
Control key & not found
What causes this issue? The control key that you maintained in the operation does not exist. The system issues an error message and will not allow yo...