Do you have any question about this error?
Message type: E = Error
Message class: C7 - Scheduling
Message number: 027
Message text: Quantity unit of the operation/activity is invalid
The quantity unit that you have maintained in the operation does not
exist.
INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJECT DOKU ID TX
INCLUDE 'NA_ALLG_VORGEHEN' OBJECT DOKU ID TX
Check the quantity units you have maintained and change them if
necessary.
<DS:TRAN.OP02>Proceed</>
ENDIF
Error message extract from SAP system. Copyright SAP SE.
C7027
- Quantity unit of the operation/activity is invalid ?The SAP error message C7027, which states "Quantity unit of the operation/activity is invalid," typically occurs in the context of production planning or project management when there is an issue with the unit of measure (UoM) assigned to an operation or activity in a routing or work breakdown structure (WBS).
Cause:
- Invalid Unit of Measure: The unit of measure assigned to the operation or activity does not exist in the system or is not valid for the specific context.
- Configuration Issues: The unit of measure may not be properly configured in the system, or it may not be assigned to the relevant material or activity type.
- Data Inconsistencies: There may be inconsistencies in the master data, such as the material master or routing data, where the unit of measure is not aligned with the expected values.
- Missing Entries: The unit of measure might be missing from the relevant tables or not maintained correctly in the configuration settings.
Solution:
- Check Unit of Measure: Verify that the unit of measure assigned to the operation/activity is valid. You can do this by checking the relevant master data (e.g., material master, routing).
- Maintain UoM in Master Data: If the unit of measure is missing, you may need to add it in the relevant master data settings. This can be done through transaction codes like
MM02
for material master orCA01
for routing.- Review Configuration: Ensure that the unit of measure is correctly configured in the system. This may involve checking the configuration settings in the SAP IMG (Implementation Guide) under Logistics or Production Planning.
- Check for Data Consistency: Run consistency checks on the data to ensure that there are no discrepancies between the routing, material master, and other related data.
- Consult Documentation: Refer to SAP documentation or help resources for specific details on how to manage units of measure in your version of SAP.
Related Information:
MM02
(Change Material), CA01
(Create Routing), and C223
(Maintain Operation).By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
C7026
Scheduling type not defined, scheduling type = "only capacity reqmts"
What causes this issue? The key that you have entered for the scheduling type does not exist.System Response Scheduling is carried out using the sch...
C7025
Scheduled start is after scheduled finish
What causes this issue? An internal error occurred.System Response INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJECT DOKU ID TXHow to fix this error...
C7028
No work center or calender in operation/activity
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C7029
No release period key defined for scheduling
What causes this issue? You have not defined a scheduling margin key for the planned order.System Response INCLUDE 'NA_ALLG_NOVERARBEITUNG'...
Click on this link to search all SAP messages.