Message type: E = Error
Message class: C7 - Scheduling
Message number: 031
Message text: Control key & not found
The control key that you maintained in the operation does not exist.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJECT DOKU ID TX
Check whether you have entered the correct control key.
INCLUDE 'NA_ALLG_VORGEHEN' OBJECT DOKU ID TX
Check whether the control key is defined in the system. Define it if
necessary.
<DS:TRAN.OP67>Proceed</>
ENDIF
Error message extract from SAP system. Copyright SAP SE.
C7031
- Control key & not found ?The SAP error message C7031 indicates that a control key specified in a transaction or configuration is not found in the system. Control keys are used in various SAP modules, particularly in Production Planning (PP) and Controlling (CO), to define how operations are to be processed.
Cause:
- Missing Control Key: The control key specified in the transaction does not exist in the system.
- Incorrect Configuration: The control key may have been deleted or not properly configured in the system.
- Typographical Error: There may be a typo in the control key entered in the transaction.
- Authorization Issues: The user may not have the necessary authorizations to access the control key.
Solution:
Check Control Key Configuration:
- Go to the transaction code
OPKP
(for controlling) orOPL8
(for production) to check the configuration of control keys.- Ensure that the control key you are trying to use is defined and active.
Verify Input:
- Double-check the control key entered in the transaction for any typographical errors.
- Ensure that you are using the correct control key for the specific process you are working on.
Create or Modify Control Key:
- If the control key does not exist, you may need to create it using the appropriate transaction (e.g.,
OPKP
for controlling).- If it exists but is not configured correctly, modify it to meet your requirements.
Check Authorizations:
- Ensure that the user has the necessary authorizations to access the control key. This may involve checking user roles and permissions.
Consult Documentation:
- Refer to SAP documentation or help resources for more information on control keys and their usage in your specific context.
Related Information:
OPKP
, OPL8
, and others depending on your specific SAP module.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or refer to SAP community forums for additional assistance.
Get instant SAP help. Start your 7-day free trial now.
C7030
Start date is in the past: today scheduling
What causes this issue? The start date determined in scheduling is in the past. In customizing, you have defined the number of days that the start da...
C7029
No release period key defined for scheduling
What causes this issue? You have not defined a scheduling margin key for the planned order.System Response INCLUDE 'NA_ALLG_NOVERARBEITUNG'...
C7032
Scheduling terminated: Scheduling parameters are missing
What causes this issue? No scheduling parameters have been maintained in customizing.System Response INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJE...
C7033
Constraint is before basic start date
What causes this issue? The constraint that you entered for the activity is before the specified basic start date.How to fix this error? INCLUDE ...