Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: BP - Budgeting and planning
Message number: 768
Message text: AB: Check against first BS element with budget
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Availability control searches upward through the hierarchy to determine
the budget-bearing element in which commitment budget availability is
checked.
The check is made against the first
<DS:GLOS.budget_structure_element>BS element</> found to have
commitment budget. A BS element may be deemed budget-bearing for this
purpose even if the current budget is zero. This may be the case if
individual <DS:GLOS.budget_type>budget types</> with values other than
zero were entered which when totalled result in a current budget total
of zero.
Error message extract from SAP system. Copyright SAP SE.
BP768
- AB: Check against first BS element with budget ?The SAP error message BP768 AB: "Check against first BS element with budget" typically occurs in the context of budget management within SAP, particularly when dealing with budget availability checks in the Budget Control System (BCS). This error indicates that there is an issue with the budget availability for a specific budget structure (BS) element.
Cause:
- Insufficient Budget: The most common cause of this error is that the budget for the specified budget structure element has been exhausted or is not sufficient to cover the transaction being processed.
- Incorrect Budget Structure: The budget structure element may not be correctly defined or may not exist in the system.
- Budget Release Issues: The budget may not have been released properly, or there may be restrictions on the budget that prevent it from being used.
- Configuration Issues: There may be configuration issues in the budget control settings that are causing the system to not recognize the budget correctly.
Solution:
- Check Budget Availability: Verify the budget availability for the specific budget structure element. You can do this by navigating to the budget management transaction (e.g., FMBB, FMAVCR01) and checking the budget status.
- Adjust Budget: If the budget is insufficient, consider adjusting the budget by increasing the budget amount or reallocating funds from other budget structure elements.
- Release Budget: Ensure that the budget has been properly released. If it is in a draft or blocked status, you may need to release it to make it available for use.
- Review Configuration: Check the configuration settings for budget control in the system. Ensure that the budget structure is correctly defined and that all necessary settings are in place.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on budget management and the error message BP768 AB.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in budget management within SAP.
Get instant SAP help. Sign up for our Free Essentials Plan.
BP767
PB: Check against first assignment object
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
BP766
PB: Check against first budget object
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
BP769
AB: Check against first budget object
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
BP770
AB: Check against first assignment object
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
Click on this link to search all SAP messages.