How To Fix BP731 - Availabilty control deactivated


SAP Error Message - Details

  • Message type: E = Error

  • Message class: BP - Budgeting and planning

  • Message number: 731

  • Message text: Availabilty control deactivated

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message BP731 - Availabilty control deactivated ?

    The SAP error message BP731, which states "Availability control deactivated," typically occurs in the context of budget management and availability control in SAP. This message indicates that the availability control for a particular budget or commitment item has been turned off, which can lead to issues in budget monitoring and control.

    Cause:

    1. Availability Control Deactivation: The most common cause of this error is that the availability control has been deactivated for the specific budget or commitment item in the configuration settings.
    2. Configuration Settings: The settings in the controlling area or the budget structure may not be properly configured to enable availability control.
    3. Document Type: The document type being used may not be set up to allow for availability control.
    4. User Authorization: The user may not have the necessary authorizations to view or manage availability control settings.

    Solution:

    1. Check Configuration:

      • Navigate to the configuration settings for availability control in the SAP system (Transaction code: SPRO).
      • Go to Controlling > Budgeting > Availability Control and check if the availability control is activated for the relevant budget structure or commitment item.
    2. Activate Availability Control:

      • If it is deactivated, you may need to activate it. This typically involves setting the appropriate flags in the configuration settings.
    3. Review Document Types:

      • Ensure that the document types being used are configured to allow for availability control. This can be checked in the document type settings.
    4. User Authorizations:

      • Verify that the user has the necessary authorizations to access and manage availability control settings. This may involve checking roles and permissions assigned to the user.
    5. Consult Documentation:

      • Refer to SAP documentation or help resources for specific steps related to your version of SAP, as the configuration paths may vary.
    6. Testing:

      • After making changes, perform tests to ensure that the availability control is functioning as expected and that the error message no longer appears.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as:
      • SPRO: Customizing settings
      • S_ALR_87013611: Budget report
      • KOB1: Display actual line items
    • SAP Notes: Check for any SAP Notes related to this error message for additional insights or patches that may address the issue.
    • Training and Documentation: Consider training sessions or documentation on budget management and availability control in SAP to better understand the implications of these settings.

    If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP Controlling (CO) for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author