Message type: E = Error
Message class: BP - Budgeting and planning
Message number: 729
Message text: You must reconstruct the availability control for project &
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
BP729
- You must reconstruct the availability control for project & ?The SAP error message BP729 indicates that there is an issue with the availability control (AVC) for a project. This error typically arises when the system detects inconsistencies or missing data in the availability control settings for a specific project.
Cause: The error message BP729 can occur due to several reasons, including: Changes in Project Structure: If there have been changes to the project structure (e.g., adding or removing WBS elements), the availability control settings may need to be updated. Missing or Incomplete Data: If the availability control data is incomplete or missing for the project, the system will prompt this error.
Configuration Issues: Incorrect configuration settings in the availability control parameters can lead to this error. Manual Changes: If manual changes were made to the project or its budget, it may disrupt the existing availability control.
Solution: To resolve the BP729 error, you can follow these steps: Reconstruct Availability Control: Go to the transaction code CJBN (Reconstruct Availability Control). Enter
Get instant SAP help. Sign up for our Free Essentials Plan.
BP728
Layout &1 is not defined
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BP727
Availability control cannot be activated in partial access
What causes this issue? The availability control of the project is not active. It is defined in budget profile of the project that the availability c...
BP730
Availability control activated without "suitable" budget
What causes this issue? In the availability control settings, you have stipulated that availability control should conduct checks against a particula...
BP731
Availabilty control deactivated
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.