How To Fix BP729 - You must reconstruct the availability control for project &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: BP - Budgeting and planning

  • Message number: 729

  • Message text: You must reconstruct the availability control for project &

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message BP729 - You must reconstruct the availability control for project & ?

    The SAP error message BP729 indicates that there is an issue with the availability control (AVC) for a project. This error typically arises when the system detects inconsistencies or missing data in the availability control settings for a specific project.

    Cause:

    The error message BP729 can occur due to several reasons, including:

    1. Changes in Project Structure: If there have been changes to the project structure (e.g., adding or removing WBS elements), the availability control settings may need to be updated.
    2. Missing or Incomplete Data: If the availability control data is incomplete or missing for the project, the system will prompt this error.
    3. Configuration Issues: Incorrect configuration settings in the availability control parameters can lead to this error.
    4. Manual Changes: If manual changes were made to the project or its budget, it may disrupt the existing availability control.

    Solution:

    To resolve the BP729 error, you can follow these steps:

    1. Reconstruct Availability Control:

      • Go to the transaction code CJBN (Reconstruct Availability Control).
      • Enter the project number for which you are receiving the error.
      • Execute the transaction to reconstruct the availability control for the specified project.
    2. Check Project Settings:

      • Review the project settings in transaction CJ02 (Change Project) to ensure that all necessary data is correctly entered.
      • Verify that the WBS elements and their associated budgets are correctly defined.
    3. Review Configuration:

      • Check the configuration settings for availability control in the project system (transaction SPRO).
      • Ensure that the settings align with your organization's requirements.
    4. Consistency Check:

      • Perform a consistency check on the project using transaction CJ_CHECK to identify any other potential issues that may need to be addressed.
    5. Consult Documentation:

      • Refer to SAP documentation or help resources for additional guidance on availability control and project management.

    Related Information:

    • Transaction Codes:

      • CJBN: Reconstruct Availability Control
      • CJ02: Change Project
      • CJ_CHECK: Check Project Consistency
      • SPRO: Customizing (Configuration) settings
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to availability control and the BP729 error.

    • User Roles: Ensure that you have the necessary authorizations to perform the actions required to resolve the error.

    By following these steps, you should be able to resolve the BP729 error and ensure that the availability control for your project is correctly set up. If the issue persists, consider reaching out to your SAP support team for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author