Do you have any question about this error?
Message type: E = Error
Message class: BP - Budgeting and planning
Message number: 728
Message text: Layout &1 is not defined
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
BP728
- Layout &1 is not defined ?The SAP error message BP728 "Layout &1 is not defined" typically occurs in the context of Business Partner (BP) data management, particularly when dealing with the layout of business partner data in the SAP system. This error indicates that the system is unable to find a specific layout configuration that is expected for the business partner data.
Cause:
- Missing Layout Definition: The layout specified in the error message (&1) is not defined in the system. This could happen if the layout was deleted or never created.
- Incorrect Configuration: The layout might be incorrectly configured or not assigned to the relevant business partner role.
- Authorization Issues: The user may not have the necessary authorizations to access the specified layout.
- Transport Issues: If the layout was transported from another system, there may have been issues during the transport process that resulted in the layout not being available.
Solution:
Check Layout Definition:
- Go to the transaction code
BP
(Business Partner) and check if the layout specified in the error message exists.- If it does not exist, you may need to create it or restore it from a backup.
Create or Modify Layout:
- If the layout is missing, you can create a new layout using the transaction code
BP
or through the relevant customizing transaction (e.g.,BP_CUSTOMIZE
).- Ensure that the layout is correctly configured for the business partner roles you are using.
Assign Layout to Business Partner Role:
- Make sure that the layout is assigned to the appropriate business partner role. This can be done in the customizing settings for business partners.
Check Authorizations:
- Verify that the user has the necessary authorizations to access the layout. This can be checked in the user roles and profiles.
Transport Issues:
- If the layout was supposed to be transported from another system, check the transport logs for any errors and ensure that the transport was successful.
Consult Documentation:
- Refer to SAP documentation or help resources for more detailed instructions on managing layouts in the Business Partner module.
Related Information:
BP
- Business PartnerBP_CUSTOMIZE
- Customizing for Business PartnerIf the problem persists after trying the above solutions, it may be beneficial to consult with your SAP Basis or functional team for further investigation.
Get instant SAP help. Start your 7-day free trial now.
BP727
Availability control cannot be activated in partial access
What causes this issue? The availability control of the project is not active. It is defined in budget profile of the project that the availability c...
BP724
Item & commitment budget almost exhausted
What causes this issue? Assigned funds are &V4& less than the commitment budget &V3& for fiscal year &V2& in document item &a...
BP729
You must reconstruct the availability control for project &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BP730
Availability control activated without "suitable" budget
What causes this issue? In the availability control settings, you have stipulated that availability control should conduct checks against a particula...
Click on this link to search all SAP messages.