Message type: E = Error
Message class: BP - Budgeting and planning
Message number: 641
Message text: Time horizon and settings for availability control are contradictory
The settings in the budget profile are inconsistent.
If you want availability control to check against overall values, you
must so specify in the time horizon.
The same applies to checks against annual values.
Have the budget profile maintained accordingly.
Error message extract from SAP system. Copyright SAP SE.
BP641
- Time horizon and settings for availability control are contradictory ?The SAP error message BP641 indicates that there is a contradiction between the time horizon settings and the availability control settings in the system. This typically occurs in the context of budget management and availability control in SAP, particularly when working with budgetary funds and planning.
Cause: The error arises when the time horizon defined for availability control does not align with the settings in the budget or planning configuration. This can happen due to: Inconsistent Time Settings: The time period defined for availability control (e.g., fiscal year, periods) does not match the time horizon set in the budget or planning configuration. Incorrect Configuration: The settings in the controlling area or the budget structure may not be properly aligned with the availability control settings. Changes in Configuration: If there have been recent changes to the budget or availability control settings, it may lead to inconsistencies.
Solution: To resolve the BP641 error, you can follow these steps: Check Availability
Get instant SAP help. Sign up for our Free Essentials Plan.
BP640
No tolerance limits maintained in controlling area &, profile &
How to fix this error? In the configuration menu, maintain the tolerance limits for controlling area &V1& in profile &V2&Error messag...
BP639
Item & payment budget almost exhausted
What causes this issue? Assigned funds are &V4& less than payment budget &V3& for fiscal year &V2& in document item &V1&a...
BP642
No tolerance limits yet maintained for profile &
How to fix this error? Go to the configuration menu and maintain the tolerance limits for profile &V1&.Error message extract from SAP system....
BP643
Usage with no effect is relevant for background activation only
What causes this issue? The budget profile includes a usage figure for availability control purposes. This is only relevant for background activatio...
Click on this link to search all SAP messages.