How To Fix BP552 - Specify the project or a top WBS element of the project


BP552 - Overview

  • Message type: E = Error

  • Message class: BP - Budgeting and planning

  • Message number: 552

  • Message text: Specify the project or a top WBS element of the project

  • Show details Hide details
  • What causes this issue?

    You want to plan a subhierarchy for project &V3&.
    In plan profile &V1& of project &V3&, the indicator for "Bottom-Up
    Planning" is set.
    If this indicator is set, the function "Total Up" is executed
    automatically in the structure planning for costs and revenues each
    time you save and check. The superior WBS element receives the total of
    all plan values of the direct subordinate WBS element as the structure
    plan value.
    Note:
    As you execute a structure planning for a subhierarchy, the plan values
    are only totaled as far as the WBS element &V2& with which you accessed
    the planning.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    The automatic totaling within the whole project or as far as
    Top-WBS-Element is then guaranteed if you access the structure planning
    with project definition &V3& or a Top-WBS-Element of the Project.

    Procedure for System Administrators

    You can switch off this message by using transaction OBA5 or by
    changing the message category on the error message, warning or
    information message.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message BP552 - Specify the project or a top WBS element of the project ?
    The SAP error message BP552 ("Specify the project or a top WBS element of the project") typically occurs in the context of project management within SAP, particularly when working with Business Partner (BP) assignments or when trying to create or modify project-related data. This error indicates that the system requires a specific project or a top-level Work Breakdown Structure (WBS) element to proceed with the operation.
    
    Cause: Missing Project or WBS Element: The most common cause of this error is that the user has not specified a project or a top-level WBS element in the transaction or function they are trying to execute. Incorrect Data Entry: The user may have entered an incorrect or incomplete project number or WBS element. Authorization Issues: In some cases, the user may not have the necessary authorizations to access the specified project or WBS element.
    Configuration Issues: There may be configuration settings in the project management module that are

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author