Message type: E = Error
Message class: BK - Create, Display, Reverse Controlling Document
Message number: 105
Message text: Assignment to project/network is not permitted for order &
Statistical order &V1& is assigned to a project. For this reason you
cannot post this order together with a project or a network.
Correct your entry.
Error message extract from SAP system. Copyright SAP SE.
BK105
- Assignment to project/network is not permitted for order & ?The SAP error message BK105, which states "Assignment to project/network is not permitted for order &," typically occurs when there is an attempt to assign a cost object (like an order) to a project or network that does not allow such assignments. This can happen for various reasons, and understanding the cause is essential for finding a solution. Causes of BK105 Error Order Type Configuration: The order type may not be configured to allow assignments to projects or networks. This is often set in the order type configuration in the SAP system. Project Definition Settings: The project or network itself may have settings that restrict the assignment of certain order types. This could be due to the project being in a specific status or having certain parameters set. Authorization Issues: The user may not have the necessary authorizations to assign the order to the project or network. Order Status: The order may be in a
Get instant SAP help. Sign up for our Free Essentials Plan.
BK104
Posting made to cost center & of the statistical order
What causes this issue? Cost center &V1& is entered in statistical order &V2&. Posting is made to this cost center.System Response C...
BK103
Reduce the consumption given in item &.
What causes this issue? Calculating the output for the consumption entered in item &V1& would lead to a field overflow for the output field.S...
BK106
Network & is not assigned to controlling area &
What causes this issue? You created a cost accounting document in controlling area &V2&. Sales order &V1& is assigned to controlling ...
BK107
Sales order & is not assigned to controlling area &
What causes this issue? You created a cost accounting document in controlling area &V2&. Network &V1& is assigned to controlling area...
Click on this link to search all SAP messages.