Message text: Network & is not assigned to controlling area &
You created a cost accounting document in controlling area &V2&. Sales
order &V1& is assigned to controlling area &V3&, not &V2&.
Processing is terminated.
Enter a different controlling area or a different sales order.
Error message extract from SAP system. Copyright SAP SE.
BK106
- Network & is not assigned to controlling area & ?The SAP error message BK106 indicates that a specific network (or project) is not assigned to the controlling area you are trying to work with. This error typically occurs in the context of project systems (PS) or controlling (CO) modules when there is a mismatch between the network and the controlling area.
Cause:
- Network Not Assigned: The network you are trying to use is not assigned to the controlling area you are working with.
- Incorrect Configuration: The network might be created in a different controlling area, or it may not have been properly assigned during its creation.
- Data Entry Error: There may be a mistake in the data entry where the wrong network or controlling area is being referenced.
Solution:
Check Network Assignment:
- Go to the network in question and check its assignment to the controlling area. You can do this by navigating to the network in the Project System (PS) module and verifying its details.
- Use transaction code CN21 (Create Network) or CN22 (Change Network) to check the controlling area assignment.
Assign Network to Controlling Area:
- If the network is not assigned to the correct controlling area, you may need to reassign it. This can typically be done in the network settings.
- Ensure that the network is created under the correct project definition that is linked to the desired controlling area.
Verify Project Definition:
- Check the project definition associated with the network. Ensure that the project definition is assigned to the correct controlling area.
- Use transaction code CJ20N (Project Builder) to review the project structure.
Consult Documentation:
- If you are unsure about the configuration, refer to SAP documentation or consult with your SAP administrator or functional consultant for guidance on how to properly assign networks to controlling areas.
Check User Authorizations:
- Ensure that you have the necessary authorizations to view and modify the network and its assignments.
Related Information:
By following these steps, you should be able to resolve the BK106 error and ensure that the network is correctly assigned to the appropriate controlling area.
Get instant SAP help. Start your 7-day free trial now.
BK105
Assignment to project/network is not permitted for order &
What causes this issue? Statistical order &V1& is assigned to a project. For this reason you cannot post this order together with a project o...
BK104
Posting made to cost center & of the statistical order
What causes this issue? Cost center &V1& is entered in statistical order &V2&. Posting is made to this cost center.System Response C...
BK107
Sales order & is not assigned to controlling area &
What causes this issue? You created a cost accounting document in controlling area &V2&. Network &V1& is assigned to controlling area...
BK108
No object number could be determined for & &
What causes this issue? The SAP System could not determine the internal CO object number for account assignmnet object &V1& &V2&. The...
Click on this link to search all SAP messages.