Message text: &1 total of percentages is greater than 100%
You have created percentage rates for the assignment of budget
categories to a measure. You have entered more than 100% for a
measure.
The entry is not allowed.
Assign budget categories to the measure for a total of 100% (or less).
Error message extract from SAP system. Copyright SAP SE.
AP101
- &1 total of percentages is greater than 100% ?The SAP error message AP101 indicates that the total of percentages entered in a particular context (such as a project, cost center, or other allocation) exceeds 100%. This error typically occurs in scenarios where percentages are used to allocate costs, resources, or other values, and the system enforces a rule that the total must not exceed 100%.
Cause:
- Incorrect Data Entry: Users may have mistakenly entered percentages that, when summed, exceed 100%. For example, if three entries are 50%, 30%, and 30%, the total is 110%.
- Configuration Issues: In some cases, the configuration of the system may allow for incorrect percentage entries or may not enforce the 100% rule properly.
- Multiple Entries: If multiple lines or entries are being processed, it’s possible that the cumulative percentage across these entries exceeds 100%.
Solution:
- Review Entries: Check all percentage entries in the relevant transaction or document. Ensure that the total does not exceed 100%. Adjust the percentages as necessary.
- Recalculate Percentages: If the percentages are based on calculations or allocations, recalculate them to ensure they sum to 100%.
- Consult Documentation: If you are unsure about the correct percentages to enter, refer to any relevant documentation or guidelines that specify how to allocate percentages.
- System Configuration: If you believe the error is due to a system configuration issue, consult with your SAP administrator or technical team to review the settings related to percentage allocations.
Related Information:
By addressing the root cause of the error and ensuring proper data entry and configuration, you can resolve the AP101 error effectively.
Get instant SAP help. Start your 7-day free trial now.
AP100
System error occurred in program &1 [&2]
What causes this issue? An internal error has arisen in program &V1&. The internal error ID is &V2&.System Response Processing stopp...
AP099
Sequence number &1 assigned more than once
What causes this issue? The column numbers specify the sequence of the output of value field columns within the list. However, you have entered such...
AP102
Order &1 is already budgeted or availability control is active
What causes this issue? You tried to attach order &V1& to an investment program position. However, the specifications for this program positi...
AP103
&1 total of percentages is less than 100%
What causes this issue? You have entered percentages for the assignment of a measure to budget categories. You entered percentages for at least one m...
Click on this link to search all SAP messages.