Message type: E = Error
Message class: AP - Investment program messages
Message number: 100
Message text: System error occurred in program &1 [&2]
An internal error has arisen in program &V1&.
The internal error ID is &V2&.
Processing stopped.
Note how the error arose and inform the SAP Hotline, which will
look into the problem.
Error message extract from SAP system. Copyright SAP SE.
AP100
- System error occurred in program &1 [&2] ?The SAP error message AP100, which states "System error occurred in program &1 [&2]," is a generic error message indicating that an unexpected issue has occurred in the SAP system. This error can arise from various underlying causes, and it typically requires further investigation to determine the specific reason. Possible Causes: Program Errors: There may be a bug or issue in the ABAP program indicated by &1. Database Issues: Problems with the database, such as deadlocks or connection issues, can trigger this error.
Configuration Issues: Incorrect configuration settings in the system can lead to unexpected behavior. Memory Issues: Insufficient memory or resources on the application server can cause system errors. Transport Issues: If a transport request was not imported correctly, it could lead to inconsistencies in the system. User Authorization: Lack of proper authorizations for the user executing the program can also lead to errors. Solutions: Check the Short Dump: Use transaction code ST22 to check for any short
Get instant SAP help. Sign up for our Free Essentials Plan.
AP099
Sequence number &1 assigned more than once
What causes this issue? The column numbers specify the sequence of the output of value field columns within the list. However, you have entered such...
AP098
No further changes allowed to controlling area &1
What causes this issue? There is already an allocation to capital investment program position &V2& - &V3& - &V4&, which belon...
AP101
&1 total of percentages is greater than 100%
What causes this issue? You have created percentage rates for the assignment of budget categories to a measure. You have entered more than 100% for ...
AP102
Order &1 is already budgeted or availability control is active
What causes this issue? You tried to attach order &V1& to an investment program position. However, the specifications for this program positi...
Click on this link to search all SAP messages.