Message type: E = Error
Message class: AJ - Billing program
Message number: 567
Message text: Operand period &1-&2 is not within billing period &3-&4
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
AJ567
- Operand period &1-&2 is not within billing period &3-&4 ?The SAP error message AJ567 indicates that there is a mismatch between the operand period specified in a billing document and the billing period defined in the system. This error typically occurs during the billing process, particularly when dealing with billing plans or periodic billing.
Cause: The error message "Operand period &1-&2 is not within billing period &3-&4" suggests that the specified operand period (which could be a date range for a service or product) does not fall within the defined billing period. This can happen due to several reasons: Incorrect Date Ranges: The dates entered for the operand period may be outside the billing period defined in the billing plan. Billing Plan Configuration: The billing plan may not be set up correctly, leading to discrepancies in the expected billing periods. Changes in Billing Periods: If there have been changes to the billing periods after the operand period was defined, this could lead to conflicts. Data
Get instant SAP help. Sign up for our Free Essentials Plan.
AJ566
Doc. no. &1, installation &2, period &3-&4: Error cancelling usage factor
What causes this issue? During the adjustment reversal of billing document number &V1&, a reversal of the usage factors for installation &...
AJ565
Unit of measurement &1, time &2-&3: Error in usage factor
What causes this issue? An error occured while you were determining the usage factor for the unit of measure &V1& for installation &V4&am...
AJ568
Cannot determine usage factor for bill &1, operand &2 due to schema step
What causes this issue? An error occurred while the usage factor was being determined in function module &V3&, in include &V4&. The e...
AJ569
Cannot determine usage factor (operand &1/&2 equals unit of measure &3)
What causes this issue? You are using operand &V2& in the <DS:DE.CSNO>schema step during billing</> &V4& to differentiate...
Click on this link to search all SAP messages.