Do you have any question about this error?
Message type: E = Error
Message class: AH - IS-U billing (master data)
Message number: 688
Message text: Enter an end date
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
AH688
- Enter an end date ?The SAP error message AH688 ("Enter an end date") typically occurs in the context of managing master data, particularly when dealing with validity periods for certain objects, such as contracts, pricing conditions, or other time-sensitive data entries. This error indicates that the system requires an end date to be specified for the data entry you are trying to save or process.
Cause:
- Missing End Date: The most common cause of this error is that the user has not entered an end date for a validity period where it is required.
- Incorrect Data Entry: The end date may have been inadvertently left blank or not filled in due to oversight.
- System Configuration: In some cases, the system configuration may require an end date for certain transactions or data entries that are not being met.
Solution:
- Enter an End Date: The primary solution is to go back to the relevant screen and enter a valid end date for the record you are trying to create or modify. Ensure that the end date is logically consistent with the start date (i.e., the end date should be after the start date).
- Check Validity Periods: If you are working with master data that has validity periods, ensure that both the start and end dates are filled in correctly.
- Review Documentation: If you are unsure about the required fields, refer to the relevant SAP documentation or help files for guidance on the specific transaction or data entry you are working with.
- Consult with SAP Support: If the issue persists or if you believe it is related to system configuration, consider reaching out to your SAP support team or consulting with an SAP expert.
Related Information:
By following these steps, you should be able to resolve the AH688 error and successfully complete your data entry in SAP.
Get instant SAP help. Start your 7-day free trial now.
AH687
Enter a franchise fee price that is calculated at runtime
What causes this issue? The price amount is to be calculated at runtime. A franchise fee price must be specified.How to fix this error? Specify a fr...
AH686
Billing order selection contains no entries
What causes this issue? Billing is to be performed for a billing order selection.System Response The billing order selection contains no entries.How...
AH689
Routine &1 include &2: parameter &3 not specified
What causes this issue? During conversion of units of measurement in a dimension, the system established that not all required units of measurement h...
AH690
Deviation of meter reading results: min. date &1 max. date &2
What causes this issue? The meter reading results corresponding to the meter reading order were not recorded on the same day. The earliest and most r...
Click on this link to search all SAP messages.