How To Fix AH684 - Dev. &1 reg. &2 per. &3-&4: No MR result marking start of billing period


AH684 - Overview

  • Message type: E = Error

  • Message class: AH - IS-U billing (master data)

  • Message number: 684

  • Message text: Dev. &1 reg. &2 per. &3-&4: No MR result marking start of billing period

  • Show details Hide details
  • What causes this issue?

    Billing or simulation cannot be processed because there are not enough
    meter reading results. In this case, a meter reading result is missing
    that marks the start of the period to be billed or simulated.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Make sure the following criteria are met:
    For billing, there must be at least one meter reading result for each
    register to be billed that marks the start of the period to be billed.
    For the overall check and budget billing simulation, there must be at
    least one meter reading result that marks the start of the period to be
    simulated.
    In most cases, this is the move-in result or the periodic result from
    the last billing.
    Enter the missing meter reading results
    Repeat the transaction that was cancelled because of the missing meter
    reading.
    You should be aware that a meter reading result is only valid for
    billing if the status is <LS>billable</> or <LS>released by agent</>.
    You can use the following <LS>analysis utilities</>:
    RESET N1
    You can gain an overview of meter readings already performed using the
    <DS:TRAN.EALZ>billing view of the installation</>.
    Enter the above device number as the serial number and register number
    in the selection and start the report.
    You can determine which meter readings are missing by comparing the
    meter reading dates with the required meter reading dates in the
    billing view of the installation.
    INCLUDE ISU_WEITEREINFOS OBJECT DOKU ID TX
    <DS:TX.ISU_BI_MR_AND_BILLINGPERIODS>billing periods and meter reading
    results</>.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message AH684 - Dev. &1 reg. &2 per. &3-&4: No MR result marking start of billing period ?
    The SAP error message AH684 indicates that there is an issue with the marking of the Material Requirements (MR) results for a specific development area and period. This error typically arises in the context of billing processes, particularly in the areas of project systems, production planning, or materials management.
    
    Cause: The error message AH684 is triggered when the system cannot find a valid marking for the Material Requirements results at the start of the billing period. This can occur due to several reasons, including: Missing MR Results: The required Material Requirements results have not been generated or marked for the specified period. Incorrect Configuration: There may be configuration issues in the project or billing settings that prevent the system from recognizing the MR results. Data Inconsistencies: There could be inconsistencies in the data related to the project or materials that are causing the system to fail in finding the necessary results. Timing Issues: The MR results

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant