Message type: E = Error
Message class: AB -
Message number: 037
Message text: No authorization for cost planning
You do not have authorization for cost planning with cost element &V2&
in controlling area &V1&.
Error message extract from SAP system. Copyright SAP SE.
AB037
- No authorization for cost planning ?The SAP error message AB037, which states "No authorization for cost planning," typically occurs when a user attempts to access cost planning functions in SAP but lacks the necessary authorizations to perform that action. This can happen in various modules, such as Controlling (CO) or Project System (PS), where cost planning is a critical function.
Cause: Missing Authorization Roles: The user does not have the required authorization roles assigned to their user profile. Authorization Object Restrictions: The authorization objects related to cost planning (e.g., K_AKTIV, K_CCA, K_COSP) may not be properly configured for the user. User Profile Issues: The user profile may not be correctly set up, or the user may be assigned to a role that does not include cost planning permissions. Client-Specific Settings: The error may also arise due to client-specific settings or restrictions that limit access to certain functionalities.
Solution: Check User Authorizations: Use transaction code SU53 immediately after encountering the error to see which
Get instant SAP help. Sign up for our Free Essentials Plan.
AB036
No totals can be created using sort version &
What causes this issue? You selected a summary report and at the same time entered sort version &V1& which does not provide for totalling at ...
AB035
There is an incorrect posting date (&3) in asset &1 &2
What causes this issue? The posting date &V3& is not valid in the system.System Response No further processing of the report.How to fix this...
AB038
No authorization for cost planning
What causes this issue? You are not authorized for cost planning on cost center &V2& in controlling area &V1&.Error message extract f...
AB039
No authorization for cost planning
What causes this issue? You do not have authorization for cost planning (transaction &V2&) in controlling area &V1&.Error message ext...
Click on this link to search all SAP messages.