How To Fix AB039 - No authorization for cost planning


AB039 - Overview

  • Message type: E = Error

  • Message class: AB -

  • Message number: 039

  • Message text: No authorization for cost planning

  • Show details Hide details
  • What causes this issue?

    You do not have authorization for cost planning (transaction &V2&) in
    controlling area &V1&.

    Error message extract from SAP system. Copyright SAP SE.


AB039 - Details

  • The SAP error message AB039, which states "No authorization for cost planning," typically occurs when a user attempts to access cost planning functions in SAP but lacks the necessary authorizations. This can happen in various modules, such as Controlling (CO) or Project System (PS), where cost planning is a critical function.
    
    Cause: Missing Authorizations: The user does not have the required authorization objects assigned to their user profile for cost planning activities. Role Configuration: The roles assigned to the user may not include the necessary permissions for the specific cost planning transactions or reports. Organizational Level Restrictions: The user may have restrictions based on organizational levels (e.g., company code, cost center) that prevent them from accessing certain cost planning functions.
    Solution: Check User Authorizations: Use transaction code SU53 immediately after encountering the error to see which authorization check failed. This will provide insight into what specific authorization object is missing. Review the user’s roles and authorizations using transaction

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


AB039 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author