Message type: E = Error
Message class: 61 - Fehlermeldungen fuer Bedarfsplanung
Message number: 221
Message text: Material's assembly scrap is &
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
61221
- Material's assembly scrap is & ?The SAP error message 61221, which states "Material's assembly scrap is &," typically occurs in the context of production planning and execution, particularly when dealing with assembly processes in SAP. This error indicates that there is an issue with the scrap percentage defined for a material in the assembly process.
Cause:
- Scrap Percentage Not Defined: The material in question may not have a scrap percentage defined in the material master or in the production order.
- Invalid Scrap Value: The scrap percentage might be set to an invalid value (e.g., negative values or values exceeding 100%).
- Configuration Issues: There may be issues with the configuration of the production process or the material master data.
- Missing Data: Required data for the assembly process might be missing or incorrectly configured.
Solution:
Check Material Master Data:
- Go to the material master (transaction code MM03) and check the relevant views (especially the Accounting and MRP views) to ensure that the scrap percentage is defined correctly.
- If it is missing, you can update it using transaction code MM02.
Review Production Order:
- Check the production order (transaction code CO02) to see if the scrap percentage is specified correctly.
- If necessary, adjust the scrap percentage in the production order.
Validate Configuration:
- Ensure that the configuration settings for the production process are correct. This may involve checking the routing and bill of materials (BOM) associated with the material.
- Use transaction codes like CS03 (to view BOM) and CA03 (to view routing) to verify the settings.
Consult Documentation:
- Review SAP documentation or help files related to production planning and assembly processes for additional guidance on scrap handling.
Contact Support:
- If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
Transaction Codes:
SAP Notes: Check for any relevant SAP Notes that may address this specific error message or provide additional troubleshooting steps.
Documentation: Refer to SAP Help Portal for detailed information on handling scrap in production processes.
By following these steps, you should be able to identify and resolve the issue related to the SAP error message 61221.
Get instant SAP help. Start your 7-day free trial now.
61220
The sum of the usage probabilitites is &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
61219
Inserting is not possible in the discontinue/follow-up procedure
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
61222
Time interpr.only poss.when using period lot size with planning calendar
What causes this issue? The function, "Time interpretation for calendar as delivery dates" is only possible in combination with the period ...
61223
Do not maintain time interpretation and scheduling together
What causes this issue? The function "Interpretation of points of time in the calendar" cannot be combined with sceduling.System Response ...
Click on this link to search all SAP messages.