How To Fix 61223 - Do not maintain time interpretation and scheduling together


61223 - Overview

  • Message type: E = Error

  • Message class: 61 - Fehlermeldungen fuer Bedarfsplanung

  • Message number: 223

  • Message text: Do not maintain time interpretation and scheduling together

  • Show details Hide details
  • What causes this issue?

    The function "Interpretation of points of time in the calendar" cannot
    be combined with sceduling.

    System Response

    You can use scheduling to determine that the beginning of the period or
    the end of the period are interpreted as availability dates for period
    lot-sizes - as opposed to the default that the first requirement within
    the period is interpreted as the availability date.
    As this involves the scheduling of the availability date, this
    indicator cannot be combined with the indicator for the "Time
    interpretation for calendar as delivery dates".

    How to fix this error?

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 61223 - Do not maintain time interpretation and scheduling together ?
    The SAP error message 61223, "Do not maintain time interpretation and scheduling together," typically occurs in the context of time management and scheduling in SAP systems, particularly when dealing with work schedules, time evaluation, or personnel planning.
    
    Cause: This error arises when there is a conflict in the configuration settings for time interpretation and scheduling. Specifically, it indicates that both time interpretation (which deals with how time data is interpreted and processed) and scheduling (which involves planning and assigning work times) are being maintained simultaneously for the same object or configuration. This is not allowed because it can lead to inconsistencies in how time data is processed.
    Solution: To resolve this error, you need to ensure that you are not trying to maintain both time interpretation and scheduling settings for the same object. Here are the steps you can take: Review Configuration: Check the configuration settings in the relevant areas of SAP (such as the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author