Message type: E = Error
Message class: 61 - Fehlermeldungen fuer Bedarfsplanung
Message number: 222
Message text: Time interpr.only poss.when using period lot size with planning calendar
The function, "Time interpretation for calendar as delivery dates"
is only possible in combination with the period lot size with planning
calendar.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
61222
- Time interpr.only poss.when using period lot size with planning calendar ?The SAP error message 61222, which states "Time interpretation only possible when using period lot size with planning calendar," typically occurs in the context of production planning and material requirements planning (MRP) when there is a mismatch in the configuration of lot sizing and the planning calendar.
Cause:
This error arises when:
- Lot Size Configuration: The lot size is set to a period lot size (e.g., monthly, weekly) but the planning calendar is not properly configured to support this type of lot size.
- Planning Calendar: The planning calendar may not be aligned with the period lot size settings, leading to inconsistencies in how time periods are interpreted for planning purposes.
- Master Data Issues: There may be issues with the master data settings for the material or the production version that do not align with the expected configurations.
Solution:
To resolve this error, you can take the following steps:
Check Lot Size Settings:
- Go to the material master record (transaction code MM03) and check the lot size settings in the MRP view. Ensure that the lot size is set correctly as a period lot size.
Review Planning Calendar:
- Ensure that the planning calendar is correctly defined and is compatible with the period lot size. You can check this in the configuration settings (transaction code SPRO) under:
- Production ? Basic Data ? Lot Size ? Define Lot Size.
- Make sure that the planning calendar is set up to match the periods defined in the lot size.
Adjust Master Data:
- Review the production version and routing for the material to ensure that they are correctly configured to work with the period lot size and planning calendar.
Consult Documentation:
- Refer to SAP documentation or help files for specific details on configuring lot sizes and planning calendars.
Testing:
- After making the necessary adjustments, run a test planning run to see if the error persists.
Consult SAP Notes:
- Check for any relevant SAP Notes that may address this specific error or provide additional guidance.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with an SAP expert or your organization's SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
61221
Material's assembly scrap is &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
61220
The sum of the usage probabilitites is &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
61223
Do not maintain time interpretation and scheduling together
What causes this issue? The function "Interpretation of points of time in the calendar" cannot be combined with sceduling.System Response ...
61224
Multi-level discontinuation not supported
What causes this issue? The multi-level discontinuation is not supported. This functionality will not be available until a later release. The system ...
Click on this link to search all SAP messages.