How To Fix MD410 - &1: &2 (S6)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: MD - Material Requirements Planning (MRP)

  • Message number: 410

  • Message text: &1: &2 (S6)

  • Show details Hide details
  • Was verursacht dieses Problem?

    This exception message is set in the MRP list if a requirement exists
    outwith the effective out date for a part to be discontinued that
    cannot covered by planned stock. This may be a planned independent
    requirement, a sales order, a manual reservation or a dependent
    reservation from production orders, for example, that were created
    before the material was flagged to be discontinued. Dependent
    requirements of discontinued parts are automatically diverted to the
    follow-up material.

    Systemantwort

    In this case, no new order proposal is created in the planning run.
    Instead, this exception message is displayed in the MRP list.

    Wie behebe ich diesen Fehler?

    Check whether the requirement:
    can be changed to a requirement for the follow-up material, or
    create an appropriate order proposal manually

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler MD410 - &1: &2 (S6) ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:
  • MD409 &1: &2 (S3)
    Was verursacht dieses Problem? No valid run schedule header could be selected for the planned order (run schedule quantity) of a material that is p...

  • MD408 &1: &2 (S2)
    Was verursacht dieses Problem? No valid BOM could be selected for the planned order.Systemantwort BOM explosion cannot be executed. The conversio...

  • MD411 &1: &2 (S7)
    Was verursacht dieses Problem? In the MRP list, this exception message is set if an shortage occurs within the planning time fence for a material w...

  • MD412 &1: &2 (S8)
    Was verursacht dieses Problem? During the availability check with ATP logic, the system determined that this requirement is not covered by the mast...

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author