Do you have any question about this error?
Message type: E = Error
Message class: MD - Material Requirements Planning (MRP)
Message number: 409
Message text: &1: &2 (S3)
No valid run schedule header could be selected for the planned order
(run schedule quantity) of a material that is planned in repetitive
manufacturing.
No run schedule header is assigned.
This exception is set in the MRP list.
Check the validity of the run schedule headers for material and
production version.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
MD409
- &1: &2 (S3) ?Get instant SAP help. Start your 7-day free trial now.
MD408
&1: &2 (S2)
Was verursacht dieses Problem? No valid BOM could be selected for the planned order.Systemantwort BOM explosion cannot be executed. The conversio...
MD407
&1: &2 (S1)
Was verursacht dieses Problem? No BOM exists for the material or for the sales order for the process with sales order BOM.Systemantwort BOM explo...
MD410
&1: &2 (S6)
Was verursacht dieses Problem? This exception message is set in the MRP list if a requirement exists outwith the effective out date for a part to b...
MD411
&1: &2 (S7)
Was verursacht dieses Problem? In the MRP list, this exception message is set if an shortage occurs within the planning time fence for a material w...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.