How To Fix MD411 - &1: &2 (S7)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: MD - Material Requirements Planning (MRP)

  • Message number: 411

  • Message text: &1: &2 (S7)

  • Show details Hide details
  • Was verursacht dieses Problem?

    In the MRP list, this exception message is set if an shortage occurs
    within the planning time fence for a material with fixing type '2' or
    '4'.
    No order proposals are created in the planning run for shortages within
    the planning time fence for these fixing types.
    The system also does not balance the possible shortage by creating
    order proposals at the end of the planning time fence.
    Special case: direct production (collective order):
    The exception is set irrespective of the fixing type if a material
    shortage has occurred for an existing collective order.

    Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.

    Systemantwort

    This exception message is displayed in the MRP list.

    Wie behebe ich diesen Fehler?

    You have to plan manually within the planning time fence for MRP types
    with fixing type '2' or '4'.
    Therefore, the MRP controller must take appropriate measures to balance
    shortages.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler MD411 - &1: &2 (S7) ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:
  • MD410 &1: &2 (S6)
    Was verursacht dieses Problem? This exception message is set in the MRP list if a requirement exists outwith the effective out date for a part to b...

  • MD409 &1: &2 (S3)
    Was verursacht dieses Problem? No valid run schedule header could be selected for the planned order (run schedule quantity) of a material that is p...

  • MD412 &1: &2 (S8)
    Was verursacht dieses Problem? During the availability check with ATP logic, the system determined that this requirement is not covered by the mast...

  • MD413 &1: &2 (T2)
    Was verursacht dieses Problem? The opening date of the order proposal or purchase order lies in the past.Systemantwort This exception is displaye...

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author