Do you have any question about this error?
Message type: E = Error
Message class: MD - Material Requirements Planning (MRP)
Message number: 408
Message text: &1: &2 (S2)
No valid BOM could be selected for the planned order.
BOM explosion cannot be executed.
The conversion indicator for the planned order is deleted.
This exception message is set in the MRP list or in the
stock/requirements list.
Check the BOM or the BOM alternatives and the selection criteria. For
example, the BOM may no longer be valid.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
MD408
- &1: &2 (S2) ?Get instant SAP help. Start your 7-day free trial now.
MD407
&1: &2 (S1)
Was verursacht dieses Problem? No BOM exists for the material or for the sales order for the process with sales order BOM.Systemantwort BOM explo...
MD406
&1: &2 (N4)
Was verursacht dieses Problem? In the MRP list, this exception message displays, that the order proposal was newly created in the last planning run...
MD409
&1: &2 (S3)
Was verursacht dieses Problem? No valid run schedule header could be selected for the planned order (run schedule quantity) of a material that is p...
MD410
&1: &2 (S6)
Was verursacht dieses Problem? This exception message is set in the MRP list if a requirement exists outwith the effective out date for a part to b...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.