Message type: E = Error
Message class: KP - CO-OM Planning
Message number: 252
Message text: Kostenstelle & Leistungsart &: Leistungsbezug bei Leistung 0
The SAP System cannot calculate activity prices as this would involve
division by zero. Activity input is not taken into account in activity
price calculation.
Check planning of activity type &V2& in cost center &V1& and the cost
planning for period(s) &V3&.
<DS:TRAN.KP26>Activity Type Planning</>
<DS:TRAN.KP17>Primary Cost Planning</>
For actual activity price calculation, actual costs are allocated onto
the activity type by splitting, although no actual posting has taken
place for this activity type.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
KP252
- Kostenstelle & Leistungsart &: Leistungsbezug bei Leistung 0 ?Get instant SAP help. Start your 7-day free trial now.
KP251
Kostenstelle & Leistungsart &: Kosten trotz Leistung 0
Was verursacht dieses Problem? The plan and posted activity for cost center &V1&, activity type &V2& is 0. However, costs were plan...
KP250
Kostenstelle & Leistungsart &: Kosten trotz Leistung 0
Was verursacht dieses Problem? The plan or actual activity for cost center &V1&, activity type &V2& is 0. However, costs were plann...
KP253
Kostenstelle & Leistungsart &: Leistungsbezug bei Leistung 0
Plan activity for cost center &V1&, activity type &V2& is zero. However, an activity input was planned for cost center &V3&, ...
KP254
Es sind keine Leistungen gebucht worden
Was verursacht dieses Problem? No activity consumption was posted in controlling area &V1& in fiscal year &V2&.Systemantwort Actu...