Do you have any question about this error?
Message type: E = Error
Message class: KP - CO-OM Planning
Message number: 250
Message text: Kostenstelle & Leistungsart &: Kosten trotz Leistung 0
The plan or actual activity for cost center &V1&, activity type &V2& is
0. However, costs were planned or posted in period(s) &V3&.
The SAP System cannot calculate activity prices for this activity type
as this would involve division by zero. The plan or actual costs are
ignored in activity price calculation.
Check activity price calculation in planning for activity type &V2& in
cost center &V1& and the costs planned for period(s) &V3&.
<DS:TRAN.KP26>Activity Type Planning</>
<DS:TRAN.KP06>Primary Cost Planning</>
For activity price calculation in actual, actual costs are allocated
onto the activity type through splitting, although no activity posting
was made on this activity type.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
KP250
- Kostenstelle & Leistungsart &: Kosten trotz Leistung 0 ?Get instant SAP help. Start your 7-day free trial now.
KP249
Einstellungen zur &2 wurden gesichert
Was verursacht dieses Problem? Your settings for &V2& have been saved for controlling area &V1&.Systemantwort When carrying out &...
KP248
Wegen eines Fehlers wird die Verbuchung nicht gestartet
Was verursacht dieses Problem? A serious error occurred during processing.Systemantwort Processing is continued as far as possible. However, the ...
KP251
Kostenstelle & Leistungsart &: Kosten trotz Leistung 0
Was verursacht dieses Problem? The plan and posted activity for cost center &V1&, activity type &V2& is 0. However, costs were plan...
KP252
Kostenstelle & Leistungsart &: Leistungsbezug bei Leistung 0
The plan activity for cost center &V1&, activity type &V2& is 0. However, activity input was planned for period(s) &V3&.Syste...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.