Message text: Kostenstelle & Leistungsart &: Kosten trotz Leistung 0
The plan and posted activity for cost center &V1&, activity type &V2&
is 0. However, costs were planned or posted.
The SAP System cannot calculate activity prices as this would involve
division by zero. The plan costs are ignored in activity price
calculation.
Check plan activity price planning for activity type &V2&, cost center
&V1&, period(s) &V3&, and costs planned on the cost center.
<DS:TRAN.KP26>Activity Type Planning</>
<DS:TRAN.KP17>Primary Cost Planning</>
For actual activity price calculation, actual costs are allocated onto
the activity type by splitting, although no actual activity posting has
been made to this activity type.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
KP251
- Kostenstelle & Leistungsart &: Kosten trotz Leistung 0 ?Get instant SAP help. Start your 7-day free trial now.
KP250
Kostenstelle & Leistungsart &: Kosten trotz Leistung 0
Was verursacht dieses Problem? The plan or actual activity for cost center &V1&, activity type &V2& is 0. However, costs were plann...
KP249
Einstellungen zur &2 wurden gesichert
Was verursacht dieses Problem? Your settings for &V2& have been saved for controlling area &V1&.Systemantwort When carrying out &...
KP252
Kostenstelle & Leistungsart &: Leistungsbezug bei Leistung 0
The plan activity for cost center &V1&, activity type &V2& is 0. However, activity input was planned for period(s) &V3&.Syste...
KP253
Kostenstelle & Leistungsart &: Leistungsbezug bei Leistung 0
Plan activity for cost center &V1&, activity type &V2& is zero. However, an activity input was planned for cost center &V3&, ...