How to use CJ80 - Availability Control - Overview


SAP Transaction Code - Details

  • Transaction Code: CJ80

    Description: Availability Control - Overview

    Release: S/4HANA and ECC 6

  • Show technical details Hide technical details
    • Program: RCNCO081

      Screen: 0

      Authorization Object: C_PROJ_TCD

    • Development Package: KAP1

      Package Description: Project Hierarchy Reports

      Parent Package: APPL

    • Module/Component: PS-IS-REP-ACC

      Description: Accounting


Smart SAP Assistant

  • SAP Tcode: CJ80 - Availability Control - Overview
    
    Overview:
    SAP transaction code CJ80 is used to manage availability control in the SAP system. It is used to monitor and control the availability of materials and resources in a company’s production process. This transaction code is part of the SAP Logistics Execution (LE) module. 
    
    Functionality: 
    CJ80 allows users to set up and maintain availability control parameters for materials and resources. It also allows users to view the current availability of materials and resources, as well as the planned availability for future orders. Additionally, it can be used to monitor and control the availability of materials and resources in a company’s production process. 
    
    Step-by-step How to Use: 
    1. Enter transaction code CJ80 in the command field. 
    2. Select the “Availability Control” tab. 
    3. Select the “Maintain Availability Control Parameters” option. 
    4. Enter the material or resource you want to set up availability control parameters for. 
    5. Enter the desired parameters for the material or resource. 
    6. Save your changes. 
    7. To view the current availability of materials or resources, select the “Availability Overview:” tab and enter the material or resource you want to view information for. 
    8. To view planned availability for future orders, select the “Planned Availability Overview:” tab and enter the material or resource you want to view information for. 
    
    Other Recommendations: 
    It is recommended that users familiarize themselves with all of the available options in CJ80 before using it, as there are many different options available that can be used to manage availability control in SAP systems. Additionally, users should ensure that they have proper authorization before using this transaction code, as it can be used to make changes to important data in a company’s system.
    • Do you have any question about this t-code?


      Upgrade now to chat with this t-code.

Related SAP Transaction Codes

Click the links below to see the following related SAP tcodes:
  • CJ7N - Maint. DRG inv.projects for retmt....

  • CJ7M - Project Plan Cost Line Items...

  • CJ81 - Update Report List...

  • CJ88 - Settle Projects and Networks...


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant