What is top requirement date in SAP LO-PMM - Project Manufacturing Management and Optimization?


SAP Term: top requirement date


Smart SAP Assistant

  • Key Concepts: 
    The Top Requirement Date (TRD) is a feature in the SAP LO-PMM Project Manufacturing Management and Optimization component. It is used to determine the earliest date that a material requirement can be fulfilled. The TRD is calculated based on the material availability, production capacity, and other factors. 
    
    How to use it: 
    The TRD can be used to plan production and delivery schedules. It helps to ensure that materials are available when needed and that production capacity is not exceeded. The TRD can be set manually or automatically calculated by the system. 
    
    Tips & Tricks: 
    When setting the TRD manually, it is important to consider all relevant factors such as material availability, production capacity, and other constraints. This will help to ensure that the TRD is accurate and that production and delivery schedules are not disrupted. 
    
    Related Information: 
    The TRD is closely related to the Material Requirements Planning (MRP) process. MRP helps to ensure that materials are available when needed and that production capacity is not exceeded. It also helps to optimize inventory levels and reduce costs.
    • Do you have any question about this SAP term?


      Upgrade now to chat with this SAP term.

Related SAP Glossary Terms

Click the links below to see the following related SAP glossary terms:
Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author