Do you have any question about this error?
Message type: E = Error
Message class: MD - Material Requirements Planning (MRP)
Message number: 409
Message text: &1: &2 (S3)
No valid run schedule header could be selected for the planned order
(run schedule quantity) of a material that is planned in repetitive
manufacturing.
No run schedule header is assigned.
This exception is set in the MRP list.
Check the validity of the run schedule headers for material and
production version.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
MD409
- &1: &2 (S3) ?Get instant SAP help. Start your 7-day free trial now.
MD408
&1: &2 (S2)
¿Qué causa este problema? No valid BOM could be selected for the planned order.Respuesta del sistema BOM explosion cannot be executed. The convers...
MD407
&1: &2 (S1)
¿Qué causa este problema? No BOM exists for the material or for the sales order for the process with sales order BOM.Respuesta del sistema BOM exp...
MD410
&1: &2 (S6)
¿Qué causa este problema? This exception message is set in the MRP list if a requirement exists outwith the effective out date for a part to be dis...
MD411
&1: &2 (S7)
¿Qué causa este problema? In the MRP list, this exception message is set if an shortage occurs within the planning time fence for a material with f...
Haga clic en este enlace para buscar todos los mensajes de SAP.