Do you have any question about this error?
Message type: E = Error
Message class: MD - Material Requirements Planning (MRP)
Message number: 408
Message text: &1: &2 (S2)
No valid BOM could be selected for the planned order.
BOM explosion cannot be executed.
The conversion indicator for the planned order is deleted.
This exception message is set in the MRP list or in the
stock/requirements list.
Check the BOM or the BOM alternatives and the selection criteria. For
example, the BOM may no longer be valid.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
MD408
- &1: &2 (S2) ?Get instant SAP help. Start your 7-day free trial now.
MD407
&1: &2 (S1)
¿Qué causa este problema? No BOM exists for the material or for the sales order for the process with sales order BOM.Respuesta del sistema BOM exp...
MD406
&1: &2 (N4)
¿Qué causa este problema? In the MRP list, this exception message displays, that the order proposal was newly created in the last planning run that...
MD409
&1: &2 (S3)
¿Qué causa este problema? No valid run schedule header could be selected for the planned order (run schedule quantity) of a material that is planne...
MD410
&1: &2 (S6)
¿Qué causa este problema? This exception message is set in the MRP list if a requirement exists outwith the effective out date for a part to be dis...
Haga clic en este enlace para buscar todos los mensajes de SAP.