How To Fix MD411 - &1: &2 (S7)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: MD - Material Requirements Planning (MRP)

  • Message number: 411

  • Message text: &1: &2 (S7)

  • Show details Hide details
  • ¿Qué causa este problema?

    In the MRP list, this exception message is set if an shortage occurs
    within the planning time fence for a material with fixing type '2' or
    '4'.
    No order proposals are created in the planning run for shortages within
    the planning time fence for these fixing types.
    The system also does not balance the possible shortage by creating
    order proposals at the end of the planning time fence.
    Special case: direct production (collective order):
    The exception is set irrespective of the fixing type if a material
    shortage has occurred for an existing collective order.

    El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.

    Respuesta del sistema

    This exception message is displayed in the MRP list.

    ¿Cómo arreglar este error?

    You have to plan manually within the planning time fence for MRP types
    with fixing type '2' or '4'.
    Therefore, the MRP controller must take appropriate measures to balance
    shortages.

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP MD411 - &1: &2 (S7) ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:
  • MD410 &1: &2 (S6)
    ¿Qué causa este problema? This exception message is set in the MRP list if a requirement exists outwith the effective out date for a part to be dis...

  • MD409 &1: &2 (S3)
    ¿Qué causa este problema? No valid run schedule header could be selected for the planned order (run schedule quantity) of a material that is planne...

  • MD412 &1: &2 (S8)
    ¿Qué causa este problema? During the availability check with ATP logic, the system determined that this requirement is not covered by the master pl...

  • MD413 &1: &2 (T2)
    ¿Qué causa este problema? The opening date of the order proposal or purchase order lies in the past.Respuesta del sistema This exception is displa...

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant