Message type: E = Error
Message class: CY - Capacity Requirements Planning
Message number: 725
Message text: & no pertenece al grafo de recursos & en centro &
The header data of the process order specifies that the operations on
resource network structure &V2& are to be scheduled. However, the
operation has been assigned to a resource that does not belong to this
resource network structure.
Reschedule the operation to a resource in the resource network structure
&V2&, if necessary.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
CY725
- & no pertenece al grafo de recursos & en centro & ?Get instant SAP help. Start your 7-day free trial now.
CY724
Orden & operación empieza en el pasado
¿Qué causa este problema? The system is to dispatch an operation. The indicator <ZH>Indicator forwards</> is not set in the strategy pr...
CY723
Orden & operación & se encuentra fuera de holgura tiempo de seguridad
¿Qué causa este problema? An operation is to be dispatched so that it lies outside the float after production. However, in the strategy profile in ...
CY726
& no tiene enlace con el antecesor & en grafo de recursos & en centro &
¿Qué causa este problema? The header data of the process order specifies that the operations must be scheduled on a particular resource network str...
CY727
& no tiene enlace con sucesor & en grafo recursos & en centro &
¿Qué causa este problema? The header data of the process order specifies that the operations must be scheduled on a particular resource network str...
Haga clic en este enlace para buscar todos los mensajes de SAP.