Message type: E = Error
Message class: CY - Capacity Requirements Planning
Message number: 723
Message text: Orden & operación & se encuentra fuera de holgura tiempo de seguridad
An operation is to be dispatched so that it lies outside the float
after production. However, in the strategy profile in Customizing for
capacity planning the indicator <ZH>Use float aft. prod.</> is set.
This is used to specify that the planning result only counts as free
from error if the operation lies within the
float after production.
Either reschedule the operation or
reschedule another commitment to increase available capacity.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
CY723
- Orden & operación & se encuentra fuera de holgura tiempo de seguridad ?Get instant SAP help. Sign up for our Free Essentials Plan.
CY722
Orden & op.& se encuentra fuera de holgura tiempo de anticipo + holg. op.
¿Qué causa este problema? An operation is to be dispatched so that it lies outside the float before production and the operation float. However in ...
CY721
La orden & operación & se encuentra fuera de la holgura de la operación
¿Qué causa este problema? An operation is to be dispatched so that it lies outside the operation float. However, in the strategy profile in Customi...
CY724
Orden & operación empieza en el pasado
¿Qué causa este problema? The system is to dispatch an operation. The indicator <ZH>Indicator forwards</> is not set in the strategy pr...
CY725
& no pertenece al grafo de recursos & en centro &
¿Qué causa este problema? The header data of the process order specifies that the operations on resource network structure &V2& are to be s...