Do you have any question about this error?
Message type: E = Error
Message class: CP - Task list messages: Core data
Message number: 430
Message text: Hoja ruta estándar no se puede explosionar con interv. de op. &
The operations of the referenced operation set cannot be inserted with
the specified operation increment because the interval between the
first referenced operation and next operation of the the
<GL:routing>routing</>/<GL:inspection_plan>plan</> is too small.
For this reason, the operations of the refereced operation set are
inserted with an increment of one.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
CP430
- Hoja ruta estándar no se puede explosionar con interv. de op. & ?Get instant SAP help. Start your 7-day free trial now.
CP429
Indique intervalo p.numeración de operación
¿Qué causa este problema? You have chosen an operation interval with the value 0. The operation interval is the increment with which operations in...
CP428
Plan/HR y plan/HR estándar no pertenecen a la misma área de centros coste
¿Qué causa este problema? You want to include a reference operation set which belongs to a different controlling area as the routing. The plant det...
CP431
Hoja ruta estándar & marcada p.borrado
Mensaje autoexplicativo Dado que SAP cree que este mensaje de error específico 'se explica por sí mismo', no se ha proporcionado más información. ...
CP433
Atención: ya se utiliza la hoja de ruta estándar
¿Qué causa este problema? You are attempting to change a reference operation set that is referenced in other task lists. These task lists will also...
Haga clic en este enlace para buscar todos los mensajes de SAP.