How To Fix CP428 - Plan/HR y plan/HR estándar no pertenecen a la misma área de centros coste


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CP - Task list messages: Core data

  • Message number: 428

  • Message text: Plan/HR y plan/HR estándar no pertenecen a la misma área de centros coste

  • Show details Hide details
  • ¿Qué causa este problema?

    You want to include a reference operation set which belongs to a
    different controlling area as the routing.
    The plant determines the controlling area of a task list.
    You can only reference operation sets with the same controlling area in
    a routing.

    ¿Cómo arreglar este error?

    Include a reference operation set whose plant belongs to the same
    controlling area as the plant of your routing.

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP CP428 - Plan/HR y plan/HR estándar no pertenecen a la misma área de centros coste ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author