Do you have any question about this error?
Message type: E = Error
Message class: CP - Task list messages: Core data
Message number: 428
Message text: Plan/HR y plan/HR estándar no pertenecen a la misma área de centros coste
You want to include a reference operation set which belongs to a
different controlling area as the routing.
The plant determines the controlling area of a task list.
You can only reference operation sets with the same controlling area in
a routing.
Include a reference operation set whose plant belongs to the same
controlling area as the plant of your routing.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
CP428
- Plan/HR y plan/HR estándar no pertenecen a la misma área de centros coste ?Get instant SAP help. Start your 7-day free trial now.
CP427
Hoja de ruta y hoja de ruta estándar pertenecen a sociedad FI distintas
¿Qué causa este problema? You attempted to include a reference operation set which belongs to a different company code as the routing. The plant de...
CP426
La hoja de ruta esándar & & no tiene operaciones
¿Qué causa este problema? You are attempting to include a reference operation set with no operations.¿Cómo arreglar este error? El sistema emite...
CP429
Indique intervalo p.numeración de operación
¿Qué causa este problema? You have chosen an operation interval with the value 0. The operation interval is the increment with which operations in...
CP430
Hoja ruta estándar no se puede explosionar con interv. de op. &
¿Qué causa este problema? The operations of the referenced operation set cannot be inserted with the specified operation increment because the inte...
Haga clic en este enlace para buscar todos los mensajes de SAP.