Do you have any question about this error?
Message type: E = Error
Message class: CP - Task list messages: Core data
Message number: 429
Message text: Indique intervalo p.numeración de operación
You have chosen an operation interval with the value 0. The operation
interval is the increment with which operations in a reference
operation set are inserted in a routing. Therefore, the interval must
have a value of at least "1".
Select a value of at least "1" for the operation interval.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
CP429
- Indique intervalo p.numeración de operación ?Get instant SAP help. Start your 7-day free trial now.
CP428
Plan/HR y plan/HR estándar no pertenecen a la misma área de centros coste
¿Qué causa este problema? You want to include a reference operation set which belongs to a different controlling area as the routing. The plant det...
CP427
Hoja de ruta y hoja de ruta estándar pertenecen a sociedad FI distintas
¿Qué causa este problema? You attempted to include a reference operation set which belongs to a different company code as the routing. The plant de...
CP430
Hoja ruta estándar no se puede explosionar con interv. de op. &
¿Qué causa este problema? The operations of the referenced operation set cannot be inserted with the specified operation increment because the inte...
CP431
Hoja ruta estándar & marcada p.borrado
Mensaje autoexplicativo Dado que SAP cree que este mensaje de error específico 'se explica por sí mismo', no se ha proporcionado más información. ...
Haga clic en este enlace para buscar todos los mensajes de SAP.