How To Fix AP250 - Atención: El presupuesto acumulado es menor que el presupuesto global


SAP Error Message - Details

  • Message type: E = Error

  • Message class: AP - Investment program messages

  • Message number: 250

  • Message text: Atención: El presupuesto acumulado es menor que el presupuesto global

  • Show details Hide details
  • ¿Qué causa este problema?

    You specified for the reassignment of measures that the budget should
    be adopted consistently from the sending program position to the
    receiving program position. The results of this setting are:
    The overall/annual budgets of the sending program position are reduced
    by the total of the overall/annual budgets of the measure being
    reassigned.
    The overall/annual budgets of the receiving program position are
    increased by the total of the overall/annual budgets of the measure
    being reassigned.
    However, for at least one of the measures you are reassigning, the
    cumulative budget (that is, the total of the annual budgets) is
    actually less than the overall budget. As a result, the overall budget
    of the sending program position is reduced by a greater amount than the
    annual budgets. This could later cause error
    "Overall budget less than cumulative budget" (BQ154/BQ155)
    in the budgeting functions of the investment programms.

    ¿Cómo arreglar este error?

    You have two options.
    You can make sure that the overall budget of the measure being
    reassigned is completely exhausted by the annual budgets (that is, the
    total of the annual budgets equals the overall budget exactly).
    You can ignore the warning and initially accept the fact that there may
    be an inconsistency in the budget in the budgeting functions of the
    investment program. If you choose this option, however, you should
    carry out the "check" function in a budgeting function immediately
    after you reassign the measure, if the system issues the error message
    "Overall budget less than cumulative budget."
    You have to then reduce the annual budgets of the program position
    accordingly (either by reducing the original budget or by entering a
    return).

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP AP250 - Atención: El presupuesto acumulado es menor que el presupuesto global ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author